Similar Projects
12-inch and 20-inch Sand Lane Water Lines
Infrastructure
Bidding
$4,000,000 CJ est. value
Henderson, KY 42420

California Neighborhood Trap Catch Basin Rehab Project Phase 1
Infrastructure
Bidding
$290,000 CJ est. value
Louisville, KY 40202

Re-Plumbing and Re-Plastering
Renovation
Sub-Bidding
$180,000 CJ est. value
Douglass Hills, KY 40243

WWTP 2 - Carbon Filter System Pipe Gallery Painting and Valve Replacement
Alteration
Post-Bid
Georgetown, KY 40324

Plumbing Service and Repair
Term Contract
Post-Bid
Lexington, KY

Clay Hall Shower Pan Replacement
Alteration
Results
Richmond, KY 40475

Calloway County Public Library
Renovation, Addition
Results
Murray, KY 42071

Grease Trap And Septic Tank Services
Term Contract, Alteration
Post-Bid
Lexington, KY

HSB HVAC and Piping Phase 2
Alteration
Results
$1,890,000 est. value
Frankfort, KY

Maintenance, Repair and Operations (MRO) Trade Services
Renovation, Alteration
Post-Bid
Lexington, KY

Town Branch Scum Facility Improvements
Renovation, Alteration
Results
Lexington, KY 40504

USACE Replace Waste Piping B Mechanical, Ft. Campbell
Infrastructure
Post-Bid
$250,000 est. value
Fort Campbell, KY 42223

UKGS C207F Sink Installation
Renovation, Alteration
Results
$157,000 est. value
Lexington, KY 40508

Plumbing Supplies and Equipment
Term Contract
Post-Bid
Louisville, KY 40202

Water Hammer Control Upgrade
Alteration
Results
Less than $30,000 est. value
Lexington, KY

Last Updated 11/14/2022 01:34 PM
Project Title

Water Quality Improvements Project Contract 1 - Waterlines

Physical Address View project details and contacts
City, State (County) West Liberty, KY 41472   (Morgan County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,337,355 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 1 - Work is to include replacement of approximately 6.670 FL of 6-inch waterline, other appurtances, and service meters. Installation of a hydropneumatics pump stations. Bids will be received from a single prime Contractor per each contract. Bids shall be on a unit price basis. A 5% bid bond is required. Questions regarding this project are to be addressed to Matt Steen with Nesbitt Engineering (859)685-4523, msteennei-kv.com. Before 9/28/2022 at 5pm. Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, Non-segregated facilities order 32FR 7439, and the Contract Work Hours Standard Act. Bidders must comply with President's Executive Order No. 11246 as amended, prohibiting discrimination in employment regarding race, creed, color, sex or national origin. This project will be in compliance with Executive Order 11246 (Equal Employment Opportunity) as amended. Contractors/subcontractors will comply with 41 CFR 60-4, (affirmative action), to insure equal opportunity to females and minorities and will apply the time tables and goal set forth in 41 CFR 60-4. Bidders will make positive efforts to use small, minority, women owned and disadvantaged businesses. DBE's are encouraged to bid. The owner reserves the right to waive any informality or to reject any or all bids. Procurement will be subject to DOW Procurement Guidance including the Davis-Bacon Act. This contract is being funded in part with a SRF loan. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Bid award will be made to the lowest, responsive, responsible bidder.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents