Similar Projects
Coddle Creek Tributary Outfall Near Concord Parkway South - City of Concord
Infrastructure
Conception
$4,746,000 est. value
Concord, NC 28025

Concord Farms Realignment - City of Concord
Alteration
Conception
$4,000,000 est. value
Concord, NC 28027

Davidson Highway Industrial
New Construction, Infrastructure - 139,800 SF
Design
$75,000,000 CJ est. value
Concord, NC 28027

Red Bull Manufacturing and Distribution Center
New Construction, Infrastructure - 1,400,000 SF
Design
$740,000,000 CJ est. value
Concord, NC 28027

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Substation T
Infrastructure
Post-Bid
Concord, NC

Road Improvements for New Roberta Road Middle School
Infrastructure
Post-Bid
Concord, NC 28027

Coulwood Stream Restoration Project and Valley Haven Stream Restoration Project
Infrastructure
Results
$5,000,000 est. value
Charlotte, NC

FY22 Small Diameter Water/Sewer Service
Infrastructure
Results
Charlotte, NC

R. Brown McAllister Elementary School - Early Release Packages
New Construction, Infrastructure - 116,000 SF
Construction
$37,000,000 CJ est. value
Concord, NC 28025

Christenbury Village
New Construction, Infrastructure - 102,000 SF
Construction
$94,000,000 CJ est. value
Concord, NC 28025

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

Lakeshore Corporate Park
New Construction, Infrastructure - 660,000 SF
Pending Verification
$49,000,000 CJ est. value
Kannapolis, NC 28082

Aviation Boulevard/Zephyr Place Connecting Road - City of Concord
Infrastructure
Conception
$3,400,000 est. value
Concord, NC

Last Updated 03/16/2023 03:26 PM
Project Title

Hillcrest Dr and Willow Ln Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Harrisburg, NC 28075   (Cabarrus County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $87,586 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The contract with GreenWater Development Inc. will be up for approval on the March 13, 2023 Town Council agenda. Construction is planned to begin this spring but no definitive date yet. The Town of Harrisburg will accept bids for the following projects: Reconstructing and upgrading the stormwater system along Willow Ln and the intersection with Hillcrest Dr. 1. Repair of one (1) junction structure mortar-seals 2. Installation of approximately 138 LF of 18" R.C. Pipe Culvert, Class III 3. Installation of approximately 72 LF of 24" R.C. Pipe Culvert, Class III 4. Installation of one (1) reinforced concrete flared end section 5. Installation of one (1) 75"x120" precast lid with two manhole rings & covers on existing junction structure 6. Excavation and removal of approximately 210 LF of existing pipe in preparation for new pipe installation 7. Installation of approximately 13 TN of asphalt concrete intermediate course, Type I 19.0 C 8. Installation of approximately 35 TN of riprap 9. Installation and maintenance of Erosion Control measures, as specified 10. Replacement of approximately 50 SY of 6" Concrete Driveway All work is to be substantially completed within 90 days of the written Notice To Proceed and completed and ready for final payment within 120 days of the written Notice To Proceed. The terms Engineer and Owner are used interchangeably in this document. The party submitting a bid is solely responsible for delivery of the bid at the specified location prior to the deadline for receipt of bids. Any questions must be sent to Patrick Kennes at pkennes@harrisburgnc.org prior to close of business on Friday, February 17, 2023. The Town of Harrisburg reserves the right to add or delete from the contract quantities. Please see instructions to bidders for more information.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents