Similar Projects
Z--Lowe Rehabilitate Central Street Walkway
Term Contract
Design
$500,000 to $1,000,000 est. value
Lowell, MA 01852

Complete Streets Sidewalk Project, Great Road at Old Bolton Road and Harvard Road
Post-Bid
Less than $216,000 est. value
Stow, MA

Lost Lake/Knops Pond Herbicide
Post-Bid
Groton, MA

Scheduled and Emergency Sidewalk and ADA Improvements and Related Work at Various Locations (Including Marthas Vineyard)
Results
Less than $670,000 est. value

Rubber Playground Surfaces Maintenance and Repair Services
Results
$55,400 est. value
Cambridge, MA 02139

Grass Cutting at 6 Housing Developments
Term Contract
Post-Bid
Less than $70,000 est. value
Everett, MA

Installation of Rainbird Central Irrigation Hardware
Results
$110,000 est. value
Cambridge, MA 02139

Field Mowing
Post-Bid
Tyngsborough, MA

Vertical Granite Curb Type VA-4 Installation
Term Contract
Results
Less than $90,000 est. value
Chelmsford, MA

Natural Turf Field Restoration
Post-Bid
Groton, MA

Albion Street Improvements
Results
$723,726 est. value
Wakefield, MA 01880

Vegetation Management Program
Term Contract
Post-Bid
$100,000 est. value
Cambridge, MA

Fertilization/Slice Seeding/Aeration
Results
$8,272 est. value
Dracut, MA 01826

Spring 2021 and Fall 2021 Tree Planting and Related Services
Post-Bid
$350,000 est. value
Somerville, MA

Catch Basin Cleaning
Results
Natick, MA

Last Updated 05/11/2022 04:07 AM
Project Title

Marsh Post Trail Connection

Physical Address View project details and contacts
City, State (County) Cambridge, MA 02138 (Middlesex, Suffolk Counties)
Category(s) Heavy and Highway, Sewer and Water, Single Trades
Sub-Category(s) Landscaping/Irrigation, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of improvements to the site access and parking area and improve accessibility and circulation of bicycle, pedestrian, and vehicle traffic. Additionally, trees will be removed and replaced, a new stormwater management infiltration basin will be installed, and the entire grass area will be renovated with new soil and seeding

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents