Similar Projects
Last Updated | 04/26/2022 03:16 AM |
Project Title | Wastewater Treatment Facility Upgrades-Phase I |
Physical Address | View project details and contacts |
City, State (County) | Somerset, WI (Saint Croix County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for which bids are asked includes the following: 1. Removal of existing manual bar rack, existing automated fine screen, associated plumbing, associated concrete removal, and associated electrical work in the Headworks Building. 2. Removal of the existing Parshall flume in the Headworks Building. 3. Removal of existing HVAC units serving Headworks Building. 4. Removal of existing chemical feed pumps in Control Building. 5. Removal of existing Decant Pumps and piping in Decant Pump Station. 6. Removal of the existing PLCs in the existing control system. 7. Removal of existing automated slide gates, actuators, and associated electrical work in the SBR tanks. 8. Replace SBR aerator diffuser sleeves furnished by Owner. 9. Removal of existing standby power generator, transfer switch, and associated electrical work. 10. Removal of existing Motor Control Centers and Control Panel in Headworks electrical room. 11. Removal of existing asphalt drive and parking areas. 12. Provide new automated fine screen, screenings screw wash press, associated channel modifications, associated plumbing, and associated electrical work. 13. Provide new Parshall flume in existing Headworks Building. 14. Provide new HVAC units, associated ducting, and associated electrical work for Headworks Building. 15. Provide new chemical feed pumps and associated chemical tubing. 16. Provide new Ortho-P analyzer and associated electrical and controls work. 17. Provide new decant/sludge transfer pumps, associated piping, and associated electrical work in the existing Decant Pump Station. 18. Provide new automated valves, actuators, and associated electrical work in the existing SBR tanks. 19. Provide VFDs and associated electrical work for aeration blowers for SBR process. 20. Provide new control system software and programming for SBR process. 21. Construction of a new sludge storage tank, cover, and concrete base complete with mixing system, piping and appurtenances. 22. Construction of a new sludge pump building, base slab, piping, mixing pump, sludge load-out piping, associated electrical, associated mechanical, and associated plumbing. 23. Provide new Motor Control Center and Control Panel in Headworks electrical room. 24. Provide new standby power generator for facility, transfer switch, and associated electrical work. 25. Provide new asphalt driveway, new asphalt parking areas, site work, and yard piping. |
||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |