Similar Projects
RFQ Design - Renovate Pharmacy A/E
Term Contract, Renovation, Infrastructure - 10,075 SF
Bidding
$5,000,000 CJ est. value
Augusta, ME 04330

RFQ Design - Renovation Project at the Center Building
Renovation - 25,000 SF
Bidding
$499,000 CJ est. value
Augusta, ME 04330

C1DZ--SF330 AE Database RFI
Post-Bid
$25,000 to $10,000,000 est. value
Augusta, ME 04330

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

RFQ Design - Security Screening Center Project at the Cross State Office Building
Addition, Demolition, Infrastructure - 2,800 SF
Bidding
$1,768,350 CJ est. value
Augusta, ME 04330

Police Station Architectural and Engineering Services
New Construction, Alteration
Post-Bid
Augusta, ME

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Architectural/Structural Engineering Services for Renovation of the Former Monmouth Academy
Renovation
Post-Bid
Monmouth, ME

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Architectural/Engineering Services
New Construction, Alteration
Post-Bid
Augusta, ME

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Nrcs Maine State Office - Low Volume Road Application Bridge Design
Term Contract
Post-Bid

Multimedia Environmental Compliance Engineering Support for Navy, Marine Corps, and other DOD Installations, and Federal Agencies
Results
Norfolk, VA

Last Updated 12/08/2022 01:26 AM
Project Title

EHRM Infrastructure Upgrades - Togus ME

Physical Address View project details and contacts
City, State (County) Augusta, ME 04330   (Kennebec County)
Category(s) Professional Services
Sub-Category(s) Architectural
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,329,156 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT NO: 402-22-700 PROJECT NAME: EHRM Infrastructure Upgrades - Togus ME ESTIMATED CONSTRUCTION COST: $29,984,000 . GENERAL INTENT: The Contractor (herein referred to as "A/E") shall provide Architect/Engineer (A/E) services to design a construction project at the VA Maine Health Care System (Togus) in accordance with this design scope of work. PROJECT INFORMATION This project is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB). The NAICS Code for this procurement is 541330 "Engineering Services" and the annual small business size standard is $16.5M. This project requires a full design team to complete this project. The design must be complete and bid-ready no later than 301 calendar days after Notice of Award. The magnitude of construction is between $10,000,000.00 and $20,000,000.00. 2. STATEMENT OF WORK: A/E Part One Services (also known as Design Phase) for this design project includes site visits, field investigation, studies and user interviews to prepare drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a complete construction project to upgrade the facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system in accordance with VA OEHRM Site Infrastructure Requirements (provided by VHA). The scope of this project includes, but is not limited to, the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal & emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion, and renovation of existing space (demo, new construction, finishes, cable), addition of a new TR tower building addition at B200/200E to accommodate 10 new Telecommunications Rooms (approximately 170sqft). Construct new data center building addition of approximately 2,000 gross square feet (electrical distribution, cable management, cabinets, raised flooring, finishes, HVAC), communication infrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, and hazardous material (asbestos, lead, etc.) abatement. Project buildings include: 200, 200E, 201, 203, 204, 205, 206, 207, 208, 209, 210, 211, 212, 221, 232, 235, 238, 240, 248, 255, 300, BQ1, BQ3, BQ4, BQ27, BQ32, BQ69, 248, MRI, and site. As part of the design, evaluate the technical feasibility and cost effectiveness of converting existing space within B200/B200E as opposed to construction of a new TR tower. Provide VA with the evaluation findings. VA will select an option based on our review of the evaluation. The final design shall utilize the VA Maine selected option (new tower or renovation of existing space) for B200/200E. The scope of this project also includes demolition of all existing telecommunications infrastructure including, conduit, cabling, supports, data racks, and accessories; demolition of dedicated power infrastructure, conduit, cabling, supports, and accessories; and demolition of all HVAC infrastructure from all locations on campus. The completed design shall contain all required demolition drawings, specifications, phasing plans, etc. The VA Maine Healthcare System (Togus VAMC) campus is listed on the National Register of Historic Places, and many buildings included in this SOW are contributing buildings to this status. Building Quarters 1 (BQ1) is a National Historic Landmark. VA Maine will conduct consultation with local, state, and federal historic officials as required; however, as part of this SOW the designer of record will be required to update and/or modify their design as necessary to address comments resulting from the historic consultation and review process. The selected A/E shall prepare all required National Environmental Policy Act (NEPA) analysis and Environmental Assessment reports and documentation for any improvements made as part of this EHRM project. A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation (solicitation support) and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 4 site visits per month during construction (both scheduled and emergent) to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance and participation during the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor's as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. All Part Two Services are optional line items and will not be exercised at the time of award. All questions shall be submitted via email to Lorna.Craig@va.gov by May 17, 2022, at 4:00 PM ET. A site visit will be authorized for the highest rated firm during the negotiation process. An award will be made as long as the negotiation of rates and hours leads to a fair and reasonable determination of the final contract price. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents