Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Empire Avenue, Park Avenue, SR224 Intersection and Street Improvements -CP0539 - City of Park City
Infrastructure
Conception
$2,800,000 CJ est. value
Park City, UT 84060

I-80 at Echo and Wanship Bridge Preservation
Infrastructure
Bidding
$3,000,000 CJ est. value
Coalville, UT 84017

I-80 at Echo and Wanship Bridge Preservation
Infrastructure
Bidding
$3,000,000 CJ est. value
Coalville, UT 84017

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

Asphalt Repair and Replacement - East 224 Connector/Fox Point
Post-Bid
Park City, UT

Moenave Trail Improvements
Results

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Results
Less than $3,308,642 est. value

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

Park City Mountain Resort Area Base Master Plan
New Construction, Infrastructure - 27,100 SF
Pending Verification
$76,300,000 CJ est. value
Park City, UT 84060

I-80; Emory to Castle Rock
Infrastructure
Bidding
$6,000,000 CJ est. value
Coalville, UT 84017

Crack Sealing and Seal Coating
Post-Bid
Park City, UT

Materials and Services
Results
UT

Sommet Blanc
New Construction, Infrastructure - 3,600 SF
Pending Verification
$18,000,000 CJ est. value
Park City, UT 84060

South Summit School District Asphalt Maintenance 2021
Infrastructure
Post-Bid
Kamas, UT

Last Updated 08/19/2022 04:05 AM
Project Title

Iron Horse Complete Street Improvements - CP0547 - City of Park City

Physical Address View project details and contacts
City, State (County) Park City, UT 84060   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is seeking funds to develop Iron Horse as a Complete Street in accordance with the City's Complete Street Policy. This includes adding sidewalks and improving several crossings in the area that will facilitate safe pedestrian access to and from the surrounding destinations. Improvements include adding sidewalks and crosswalks, creating a crossing to connect to a new multi-use pathway connection, and creating safe business accesses and connecting pathways to the Rail Trail. As of August 18, 2022, this project is currently in the FY 2022-2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents