Last Updated 02/09/2022 05:43 AM
Project Title

Preservation - Lee/kershaw Counties

Physical Address View project details and contacts
City, State (County) (Kershaw, Lee Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds and Insurance 1.000 Ls Traffic Control 1.000 Ls Railroad Insurance and Flagging 001 1.000 Ls Removal & Disposal of Existing Pavement 100.000 Sy Borrow Excavation 1,104.000 Cy Maintenance Stone 20.000 Ton Liquid Asphalt Binder Pg64-22 750.279 Ton Full Depth Asph. Pav. Patching 6" Unif. 2,000.000 Sy Milling Existing Asphalt Pavement (Variable) 2,750.000 Sy Milled-in Rumble Strip 12.200 Mi Hot Mix Asphalt Surface Course Type D 11,067.083 Ton Preventative Maintenance Surface Treatment 51,900.000 Sy Driveway Paving-surface Type D 475.625 Ton Permanent Construction Signs (Ground Mounted) 2,244.000 Sf 4" White Broken Lines -(Gaps Excluded)-fast Dry Paint 12,500.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-fast Dry Paint 302,820.000 Lf 8"White Solid Lines(Crosswalk&channelization)fast Dry Paint 250.000 Lf 24" White Solid Lines (Stop/diagonal Lines)-fast Dry Paint 1,660.000 Lf White Single Arrow (Left, Straight, Right)-fast Dry Paint 28.000 Ea White Word Message "Only"-fast Dry Paint 16.000 Ea Railroad Crossing Symbols - Fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 29,740.000 Lf 4"Yellow Solid Line(Pvt.edge&no Passing Zone)-fast Dry Paint 180,120.000 Lf 4" White Broken Lines(Gaps Excl.)thermoplastic- 90 Mil. 6,250.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 151,410.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 125.000 Lf 24" White Solid Lines (Stop/diag Lines)-thermo.-125 Mil 830.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 14.000 Ea White Word Message "Only" -thermoplastic - 125 Mil. 8.000 Ea Railroad Crossing Symbols - Thermoplastic - 125 Mil. 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)thermoplastic - 90 Mil. 14,870.000 Lf 4" Yellow Solid Lines(Pvt.edge Lines) Thermo-90 Mil. 90,060.000 Lf Permanent Clear Pavement Markers- Mono-dir.- 4"X4" 30.000 Ea Permanent Yellow Pavement Markers Bi-dir.- 4"X4" 1,035.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 15.000 Lf Furnish & Instl No. 14 Copper Wire,1-conductor for Loop Wire 350.000 Lf Sawcut for Loop Detector 107.000 Lf Adjust Drop Inlet Adjust D. I. 5.000 Ea Detectable Warning Material 50.000 Sf Pedestrian Ramp Construction 100.000 Sy Permanent Grassing for Non-permitted Resurfacing Projects 5.353 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents