Similar Projects
Fieldstone Pump Station Elimination Project
Demolition, Infrastructure
Bidding
$648,222 est. value
Conyers, GA 30013

Sanitary Sewer Ream and Reline (8 Inch DIP)
Infrastructure
Bidding
$200,000 est. value
Flowery Branch, GA

Grease Trap Pumping
Post-Bid
GA

Taurus Way Connector
Infrastructure
Post-Bid
Bainbridge, GA 39817

Splost North Mainland Phase III Force Main Improvement
Results
Less than $2,800,000 est. value
Brunswick, GA 31520

Grease Trap Maintenance
Term Contract
Results
$11,130 est. value
Albany, GA 31702

GEFA Sanitary Sewer Improvements
Infrastructure
Bidding
$600,000 est. value
Metter, GA

Water and Sewer Improvements
Infrastructure
Post-Bid
Statesboro, GA

Septic Tank and Grease Trap Maintenance Services Countywide
Term Contract
Results
Atlanta, GA 30349

Cured in Place Pipe (CIPP) and Upgrades to Lift Stations
Infrastructure
Bidding
$400,000 est. value
Kingsland, GA

Sanitary Sewer Improvements to serve the Griswoldville Industrial Park
Infrastructure
Post-Bid
$1,550,000 est. value
GA

2019 CDBG Sanitary Sewer Improvements
Results
Less than $503,286 est. value
Vienna, GA 31092

Mineral Springs Road Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$750,000 est. value
Blue Ridge, GA 30513

High Service Pump Station Piping Replacement
Infrastructure
Post-Bid
Chickamauga, GA 30707

Sanitary Sewer System Improvements, 9th Street Area
Results
Vidalia, GA 30474

Last Updated 06/13/2022 02:22 AM
Project Title

Thompson Road Sewer Replacement

Physical Address View project details and contacts
City, State (County) Perry, GA 31069   (Houston County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Perry, Georgia. Completed plans call for site work for a water / sewer project. The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, and other costs and effort required to complete the following: Installation of 1,800 L.F. of 12" gravity sewer main along with associated manholes, bores, services, and accessories. The time allotted for substantial completion of the work is 90 consecutive calendar days from the Notice to Proceed, and the time allotted for final completion of work is 120 consecutive calendar days from the Notice to Proceed. Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC. located at 733 Carroll Street, Perry, GA 31069, telephone number (478) 235-0307. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. The Bidder shall affix to the outside of its Bid envelope, its Georgia Utility Contractor License Number, not the license number of a Utility manager or a subcontractor's Georgia Utility Contractor License Number. No bid will be opened unless the Contractor's Utility License Number is affixed to the envelope. Each Bid must be accompanied by a Bid Bond or certified cashier's check, in the amount of 10% of the base bid, prepared on the form of Bid Bond, section 00410, attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570 with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Each Bond shall be accompanied by a "Power of Attorney" empowering the attorney-in-fact to bind the surety and certified to include the date of the bond. Contractor will acquire all necessary Federal, State and local permits preceding the issuance of the Notice to Proceed. Owner has or will acquire all necessary easements and rights-of-way for permanent installations preceding the issuance of the Notice to Proceed. The Owner reserves the right to reject any or all Bids, to waive informalities and to readvertise. Contractor shall supply E-Verify documentation with the bid to be deemed responsive.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents