Similar Projects
Woodbridge Lane, Ridgewood Acres and Woodbridge Lane Pump Station Reconstruction Project
Renovation
Bidding
$1,000,000 to $2,499,999 est. value
Thomaston, CT 06787

Sandy Hook Pump Station Upgrade
Post-Bid
Newtown, CT

Shepaug Reservoir Gate House Inlet Screen Cleaning
Post-Bid
Waterbury, CT

Condensate Pump Station at the Ferrara School
Results
$16,952 est. value
East Haven, CT 06513

Wastewater Pump Station Rehabilitation Project
Results
Middlebury, CT

Salisbury and Sharon Regional Transfer Station
New Construction - 6,400 SF
Construction
$3,072,000 est. value
Lakeville, CT 06039

Batterson Park Pump Station Upgrade
Renovation
Post-Bid
$1,700,000 est. value
Farmington, CT

Removal and Disposal of Grease in Pump Station Wet Wells
Results
Stamford, CT 06901

Sailors Lane Pump Station Replace and Elevate Generator
Results
Milford, CT

Horsebarn Hill Pump Station
Results
Less than $550,000 est. value
Storrs, CT

Water Treatment Facility Plant Water Pump Station Improvements
Results
Less than $483,200 est. value
West Hartford, CT

Cider Mill Pump Station Upgrade
Results
Glastonbury, CT

Back-up Generator Installation & Pump Control Relocation at Pine Trail, Barbara Avenue and North Main Street Pump Stations
Results
East Hampton, CT 06424

CSO Reduction And SCADA Uprades To The Rose Alley Pumping Station And WPCF
Results
Norwich, CT 06360

Design-Build Standby Generator for Clay Hill Road Pump Station
Results
Stamford, CT

Reported 06/21/2019 12:00 AM
Project Title

Improvements to Cove River Wastewater Pumping Station

Physical Address View project details and contacts
City, State (County) West Haven, CT   (New Haven County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description Required to replace four vertical, non-clog wastewater pumps with 100 HP extended shaft motors, and electrical equipment including variable frequency drives, MCCs, and transformer. Additionally, the mechanical bar screen will be removed and replaced with two channel grinders. Structural and architectural repairs will also be performed to improve the pumping station structure. This Contract also includes work to perform improvements to the plumbing, HVAC, electrical, and instrumentation systems of the station as well as miscellaneous civil and site work and all surface restoration and miscellaneous work and cleanup to complete the work.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents