Similar Projects
Technology Place Street Extension - TR0120 - City of Norman
Infrastructure
Conception
$550,000 CJ est. value
Norman, OK 73071

Effluent Truck Wash Facility - SA0015 - City of Norman
Infrastructure
Conception
$492,950 CJ est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Infrastructure
Design
$10,000,000 CJ est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Infrastructure
Design
$10,000,000 CJ est. value
Norman, OK 73069

District 2 Luther Road Bridge Repair (N Canadian River & Railroad Bridge)
Infrastructure
Bidding
$3,000,000 CJ est. value
Oklahoma City, OK 74857

Lift Station D Force Main Replacement Phase 2
Infrastructure
Bidding
$400,000 CJ est. value
Norman, OK 73069

Moore Animal Shelter - Bid Package #2
New Construction, Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Moore, OK 73160

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Porter Avenue Waterline Replacement Phase II
Infrastructure
Results
Norman, OK

Moore Animal Shelter - Bid Package #1
New Construction, Infrastructure - 47,629 SF
Results
$6,492,069 CJ est. value
Moore, OK 73160

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

I-44 - Utilities
Infrastructure
Conception
$885,851 CJ est. value
Norman, OK 73026

Utilities - US 77
Infrastructure
Design
$1,250,000 CJ est. value
Noble, OK 73068

Last Updated 04/27/2023 09:03 PM
Project Title

Test Holes and New Water Supply Well (17)

Physical Address View project details and contacts
City, State (County) Lexington, OK 73051   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include drilling and miscellaneous test of three (3) test holes, and constructing one (1) new water supply well at the Citys well field in the Lexington WMA. Each bidder shall accompany his original bid, with a certified or Cashier's Check on a solvent bank located in Oklahoma or a Bidders Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said plans and specifications and furnish the required bonds within seven (7) days after the acceptance of his bid. The deposit will be retained by the Owner as, and for, liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds Each bidder shall accompany his bid with a sworn statement in writing that the Bidder has not directly or indirectly entered into an agreement, express of implied, with any other bidder or the price or amount of such bid or any bids, the limiting of the bids or bidders, the paying to anyone any money for promotion expenses, the parceling or farming out to any bidder or bidders or other persons of any part of the contract or any part of the subject matter of the bid or of the profits thereof A Performance, Maintenance and Statutory Bond in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract, and the bidder shall state in the proposal the name and address of the Surety or Sureties who will sign this bond in case the contract is awarded to him. The Maintenance Bond required will guarantee the repair of all damage due to improper materials or workmanship for a period of one (1) year after the acceptance of the work by the Owner. All bids shall remain on file at least forty-eight (48) hours. Bids received more than ninety-six (96) hours prior to the Bid Opening will be returned. Contract to be awarded to low responsive responsible bidder. The Owner reserves the right to waive any informalities in the bidding and the right to reject any and all bids in accordance with the Oklahoma Competitive Bidding Act. Conditional bids shall not be accepted

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents