Similar Projects
Reported | 05/14/2021 12:00 AM |
Project Title | Highway and Structure |
Physical Address | View project details and contacts |
City, State (County) | Marshfield, WI (Wood County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1.Fine grading and shaping so base is crowned to a 2 percent from centerline, compact, pave 2250 tons of Type 4 MT 58-28S 1.5 inches thick placed in 1 lift, place 300 tons of compacted ¾” crushed for shoulders 2 foot wide by 1.5 inches dep with a shoulder machine.All work and materials shall be in accordance with Wisconsin Department of Transportation Standard Specifications for Highway and Structure Construction, 2021 Edition. Also include pricing for various asphalt projects throughout the Township for the 2021 season. 2.Crack Filling approximately six miles of Falcon Rd between Hwy 10 and Cary- Rock Rd 3.Crack Filling approximately three miles of MacArthur Dr between Hwy B and Robin Rd and from Eagle Rd to Fairhaven 4.Crack Filling approximately one mile of Starr Rd between Hwy V and Fairhaven |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |