Similar Projects
Pine Knot Job Corps Center Multiple Building Roof Replacement
Alteration
Design
$500,000 to $1,000,000 est. value
Pine Knot, KY 42635

Control Tower Roof at Carr Creek Lake
Alteration
Bidding
$25,000 to $100,000 est. value
Sassafras, KY 41759

DOC Kentucky Correctional Psychiatric Center (KCPC) Admin Building Reroof
Alteration
Bidding
$740,000 est. value
La Grange, KY 40031

Roof Replacement at the Lynch Depot
Post-Bid
Lynch, KY 40855

Wightman Unit Reroof
Post-Bid
Owensboro, KY 42303

Art Museum Roof and Window Replacements
Results
Owensboro, KY

Partial Roof Replacement at Various Schools
Renovation
Results
Louisville, KY 40203

Lynn Camp High School Phase 1 Roof Replacement
Alteration
Bidding
$200,000 est. value
Corbin, KY 40701

Alvaton Elementary School Reroof
Post-Bid
Less than $930,000 est. value
Bowling Green, KY 42101

Partial Roof Replacement at Newcomer Academy
Results
Louisville, KY 40218

Community Corrections Roof Replacement
Alteration
Bidding
$420,000 est. value
Lexington, KY 40510

Roofing Replacement at Sullivan House & Gippy Graham Shelter
Post-Bid
Frankfort, KY 40601

Partial Roof Replacement at Seneca High School
Results
Louisville, KY 40220

Roof Repairs KCTCS - Glema Mahr Arts Center
Alteration
Bidding
$990,000 est. value
Madisonville, KY 42431

Roof Restoration at WC Jail
Post-Bid
Bowling Green, KY

Last Updated 07/18/2022 01:24 AM
Project Title

Murray Readiness Center Roof Replacement Project

Physical Address View project details and contacts
City, State (County) Murray, KY 42071   (Calloway County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is a roof coating and replacement at the Department of Military Affairs - Murray Readiness Center located in Murray, Kentucky. The work consists of two roofing systems, SBS modified bitumen membrane and silicone roof coating for the existing building. Modified bitumen membrane work is the full replacement for the 910 sf Kitchen area. The remainder of the building, approximately 17,000 sf will be coated with silicone roof coating. All of the existing parapet copings, conductor heads and downspouts are also to be replaced.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents