Similar Projects
High Meadows Sewer Collection and Lift Station
New Construction, Infrastructure
Bidding
$1,422,000 CJ est. value
Fort Totten, ND 58335

Waste and Domestic Supply Pipe Replacement Project
Renovation
Sub-Bidding
$210,000 CJ est. value
Dickinson, ND 58601

Sundre Well F Connection Pipeline and Access Road
Infrastructure, Renovation
Post-Bid
$380,000 CJ est. value
Minot, ND 58701

New Utility Construction (SS Lift Station 53 Force Main)
Infrastructure
Post-Bid
$787,055 CJ est. value
Fargo, ND 58102

CRWD - NDSP Pipeline Improvements
Infrastructure
Results
$11,594,000 CJ est. value
Kindred, ND 58051

2022 Lagoon Repairs
Infrastructure
Results
$338,948 CJ est. value
Surrey, ND 58785

Prairie Skies First Addition
Infrastructure
Post-Bid
$950,000 CJ est. value
Casselton, ND 58012

2022 Fairgrounds Trunk 36-Inch Sewer Repair
Infrastructure
Results
$163,158 CJ est. value
Minot, ND 58701

Paving Improvement
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Valley City, ND 58072

Sanitary Sewer Improvement District 2022
Infrastructure
Results
$2,664,568 CJ est. value
Ashley, ND 58413

AWUD - User & Transmission Expansion Phase 2
Infrastructure
Post-Bid
$336,000 CJ est. value
Gilby, ND 58235

New Town WTP Filter Box Repairs
Renovation, Infrastructure
Results
$114,000 CJ est. value
New Town, ND 58763

Lift Station, Force Main, and Wastewater Treatment Lagoon Improvements
New Construction, Infrastructure
Results
$3,786,391 CJ est. value
Center, ND 58530

2023 Sanitary Sewer Rehabilitation - CIPP
Infrastructure
Results
$342,333 CJ est. value
Minot, ND 58701

2023 High Street East Improvements
Infrastructure
Results
$1,814,226 CJ est. value
Killdeer, ND 58640

Last Updated 02/14/2024 12:12 PM
Project Title

2021 System Improvements Phase 2 - WTP

Physical Address View project details and contacts
City, State (County) Turtle Lake, ND 58575   (McLean County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $415,900 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 7, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** A general overview of the scope of work is as follows: Contract No. 1 GENERAL CONSTRUCTION (LUMP SUM): Work generally consists of mobilization, bonding, and insurance for all Project Work shown on the civil, process, architectural, and structural drawings, including constructing a new administration area, new garage space, installation of pressure filter system, and renovations to the existing water treatment plant. Contract No. 2 MECHANICAL CONSTRUCTION (LUMP SUM): Work generally consists of mobilization, bonding, and insurance for all Project Work shown on the mechanical drawings, including new ventilation equipment, ducts, fans, plumbing, fixtures, heaters, air-conditioning, gauges, thermostats, pipe, fittings, valves, supports, anchors, vents, and all related appurtenances. Contract No. 3 ELECTRICAL CONSTRUCTION (LUMP SUM): Work generally consists of mobilization, bonding, and insurance for all Project Work shown on the electrical drawings including electrical labor, service-entrance equipment, trenching, excavation, cables, wiring, disconnect switches, lighting, conduits, fittings, boxes, panelboards, motor control centers, variable frequency drives, control panels, instrumentation and control devices, and all related electrical, instrumentation and control appurtenances as indicated. Contract No. 4 COMBINED CONSTRUCTION (LUMP SUM): Mobilization, bonding, and insurance for all general construction, mechanical construction, and electrical construction as described in Contracts No. 1 through 3. Separate Bids will be received for Contract No. 1 General Construction; Contract No. 2 Mechanical Construction; Contract No. 3 Electrical Construction, and Contract No. 4 Combined Construction. Bids shall be on a lump sum basis for Contract Nos. 1, 2, 3, and 4.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents