Similar Projects
Annual Unit Price Paving Contract
Infrastructure
Bidding
$700,000 CJ est. value
Pass Christian, MS 39571

Marshall Holly Springs Micro Seal
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Holly Springs, MS 38635

Annual Contract for Concrete for Jackson County
Term Contract
Post-Bid
Pascagoula, MS

Twenty-Four Month Supply of Precast Concrete Manhole Sections and Reinforced Concrete Pipe
Term Contract
Post-Bid
Jackson, MS

Sidewalk and Concrete Maintenance
Term Contract
Results
Biloxi, MS

Concrete Installation and Repair
Alteration
Results
Ridgeland, MS

Pre-Stressed Spun Concrete Poles
Term Contract
Post-Bid
Tupelo, MS

Pre-Cast Concrete Drainage Structures Materials Only
Term Contract
Results
Ridgeland, MS

Concrete Services
Term Contract
Post-Bid
Madison, MS

Pre-Cast Concrete Drainage Structures Labor Only
Term Contract
Results
Ridgeland, MS

Annual Contract for Recycled Concrete
Term Contract
Post-Bid
Pascagoula, MS

Fy21 Shil Concrete Placement Inside Battery Area
Term Contract
Results
$8,000 to $18,000 est. value
Corinth, MS 38834

Supplies and Materials - Concrete Slabs, Limestone Rock
Infrastructure, Alteration
Post-Bid
MS

Historic Senatobia High School Phase 2 Restoration
Renovation
Results
$298,864 CJ est. value
Senatobia, MS 38668

2022 Brandon Amphitheater Concrete Repair Project
Alteration
Post-Bid
Brandon, MS 39042

Last Updated 10/24/2022 04:35 PM
Project Title

Long Beach Streetscape Signage

Physical Address View project details and contacts
City, State (County) Long Beach, MS 39560   (Harrison County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $35,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Long Beach, Mississippi, reserves the right to consider the following relevant factors in addition to the contract price in determining the lowest and best bid: bidder's skill and business judgment, his experience and his facilities for carrying out the contract, his previous conduct under other contracts and the quality of previous work, as well as his pecuniary ability, honesty, and integrity. The City also reserves the right to reject any or all bids or to waive any informality(s) in the bidding. This procurement will be subject to all applicable sections of the Mississippi Code of 1972, Annotated. Specifically, Mississippi Code of 1972, Section 31-5-37 (2012), as amended by Senate Bill 2528 (2013), "All public works projects utilizing funds received by state or local governmental entities resulting from a federally declared disaster or a spill of national significance, including damages, penalties, fines or supplemental projects paid or financed by responsible parties pursuant to a court order, negotiated settlement, or other instrument, including under any law distributing such fines and penalties including the federal Resources and Ecosystems Sustainability, Tourist Opportunities and Revived Economy of the Gulf Coast Act of 2011 (R.E.S.T.O.R.E.), the Oil Pollution Act of 1990 or the Federal Water Pollution Control Act or similar legislation, shall be subject to the hiring policies established by this section." This law requires contractors submitting bids for public works projects utilizing specified funding to certify that they will comply with the provisions of this section if they are awarded the contract. This certification must be provided with the bid. The provisions of this law require that the contractor shall submit to the Mississippi Department of Employment Security and the City of Long Beach an employment plan within seven (7) calendar days after the award of the contract by the governing authority. This law also provides that from the date the contract award is received until ten (10) business days after the receipt of the employment plan by the Mississippi Department of Employmen t Security, the contractor and any subcontractor shall not hire any personnel to fill vacant positions necessary for the public works project except residents of the state of Mississippi who are to be verified by the Mississippi Department of Employment Security and/or those qualified individuals who are submitted by the Mississippi Department of Employment Security. Failure of the Contractor to comply with these provisions shall be cause by the governing agency to vacate the contract. Awarding public contracts to non-resident Bidders will be on the same basis as the non-resident bidder's state awards contracts to Mississippi Contractors bidding under similar circumstances. In order to ensure that Mississippi's so-called Golden Rule is followed, state law requires a non-resident bidder to attach to his bid a copy of his resident state's current laws pertaining to such state's treatment of non-resident contractors. Bids may be held by the City of Long Beach, Mississippi, for a period not to exceed ninety (90) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of Bidders, prior to awarding of the Contract. s liquidated damages, the sum of $500.00 for each consecutive calendar day all questions must be submitted in writing by 10:30 am, Thursday, October 20, 2022.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents