Similar Projects
Ayer Street Water Line- City of Barre
Infrastructure
Conception
$510,000 CJ est. value
Barre, VT 05641

Brook Street Water Line - City of Barre
Infrastructure
Conception
$240,000 CJ est. value
Barre, VT 05641

Warren Covered Bridge Rehabilitation - Rebid
Infrastructure
Bidding
$1,000,000 CJ est. value
Warren, VT 05674

Warren Covered Bridge Rehabilitation - Rebid
Infrastructure
Bidding
$1,000,000 CJ est. value
Warren, VT 05674

Clarendon Vtry(42) and Clarendon Vtry(43) and Clarendon Vtry(44) and Wallingford Vtry(38) and Wallingford Vtry(40)
Renovation, Infrastructure
Post-Bid
$250,000 to $500,000 est. value
Montpelier, Wallingford, VT 05773

The Bridges Resort - Water Treatment System Improvements
New Construction, Infrastructure
Post-Bid
$425,000 CJ est. value
Warren, VT 05674

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

Swanton-St. Johnsbury Stp Lvrt(10)
New Construction, Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Montpelier, VT

Spruce Place
New Construction - 27,122 SF
Construction
$2,493,540 est. value
Berlin, VT

Yestermorrow Dormitory 1
New Construction - 1,250 SF
Construction
$70,000 est. value
Waitsfield, VT 05673

Commercial Building Addition
Addition, Demolition, Infrastructure - 1,440 SF
Pending Verification
$400,000 CJ est. value
Berlin, VT 05602

Hill Street Water Line (Upper) - City of Barre
Infrastructure
Conception
$220,000 CJ est. value
Barre, VT 05641

RFQ Contractor - 2023 U-32 Main Parking Reconstruction Project
Infrastructure
Bidding
$1,800,000 CJ est. value
Montpelier, VT 05602

Bridge Repair
Renovation
Results
Duxbury, VT

Center Street / Vine Street / Bassett Street / Church Street - City of Barre
Infrastructure
Conception
$535,000 CJ est. value
Barre, VT 05641

Last Updated 11/03/2022 06:34 AM
Project Title

Bridges (Rialto & Cummings) - City of Montpelier

Physical Address View project details and contacts
City, State (County) Montpelier, VT 05602   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bridges (Rialto & Cummings) As of October 21, 2020, this project is included in the City of Montpelier FY 2018-2023 CIP and funding is allocated for FY 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents