Similar Projects
Semi-Permanent Submersible Chopper Pump
Infrastructure
Post-Bid
Broken Arrow, OK 74012

Water Well Maintenance and Repairs as Needed
Alteration
Post-Bid
Oklahoma City, OK

Installation of Six (6) Groundwater Monitoring Wells
Results
OK

Well Plugging
Results
Oklahoma City, OK

Furnish & Install Two Submersible Water Well Pumps
Alteration
Post-Bid
El Reno, OK 73036

Lawton Groundwater Supply - Treatment Pilot
Results
$305,000 est. value
Lawton, OK 73501

Well No. 7 Improvements
Infrastructure
Post-Bid
Miami, OK

2020 CDBG Reap Water System Improvements
Infrastructure
Results
$420,000 est. value
Kenefic, OK

Well Pump & Motor Install
Infrastructure
Post-Bid
Idabel, OK

Hangar 8 Chilled Water Pump Replacement for OCAT
Infrastructure
Results
$557,800 est. value
Oklahoma City, OK 73169

Lagoon Pump
Infrastructure
Post-Bid
Tulsa, OK

Rotary Pump Water and Sewer Department
Infrastructure
Results
Tulsa, OK

Removal and Installation of Two Vertical Turbine High Service Pumps
Infrastructure
Post-Bid
$56,000 est. value
Arapaho, OK

ODVA Replace Geothermal Pumps
Infrastructure
Results
$450,000 est. value
Norman, OK 73071

KSB Multitek Pump
Alteration
Post-Bid
Vinita, OK

Last Updated 06/21/2022 02:43 PM
Project Title

Maintenance of Continuous Monitoring Potable Water System

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK 73104   (Oklahoma County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform monthly maintenance services on the continuous monitoring systems of Engineering controls at OKCVAHCS so that the systems continue to operate in compliance with VHA Directive 1061 and continue to produce reliable and accurate information

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Schedules for Plumbing, Schedules for Facility Potable Water Storage, Plumbing Piping, Facility Potable-Water Storage Tanks, Facility Roof-Mounted, Potable-Water Storage Tanks, Facility Elevated, Potable-Water Storage Tanks, Facility Ground-Mounted, Potable-Water Storage Tanks, Facility Underground Potable-Water Storage Tanks, Facility Indoor Potable-Water Storage Tanks, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 40 - Process Integration, Water Process Piping, Potable Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents