Similar Projects
Conveyance System Infrastructure Improvements
Infrastructure
Bidding
Detroit, MI

2022 Well 6 Rehabilitation
Infrastructure
Bidding
Mount Pleasant, MI

OTT Story Superfund Site Operable Unit #2 Groundwater Remedy - Phase I
New Construction
Post-Bid
$5,000,000 to $10,000,000 est. value
Muskegon, MI

Springfield Oaks New Well Project
Post-Bid
Davisburg, MI 48350

Water Well and Yard Hydrant Installation
Results
Rochester, MI 48306

Construction and Development of New Private Water Well
Results
Clare, MI

Baldwin Lake Grinder Pump Replacement
Infrastructure
Bidding
Greenville, MI

Z--SLBE - Empire Water Renovation
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Empire, MI

Type 1 Water Supply Well 12
Results
Saint Louis, MI

24 Pump Front Head Replacement
Infrastructure
Bidding
Saginaw, MI

2021 Six-Inch (6") Trailer Mounted Centrifugal Trash Pump Purchase
Post-Bid
Mount Pleasant, MI

USDA Water System Improvements
Results
Roscommon, MI

Sump Pumps - Learning Center
Infrastructure
Bidding
Lawrence, MI 49064

2016 Bond Projects - Bailey Lake Elementary Well System Improvements
Post-Bid
Clarkston, MI 48348

Palmer 3 Well Field Rehabilitation
Results
Owosso, MI 48867

Last Updated 04/11/2022 11:52 AM
Project Title

WWTP Scum Pump Project

Physical Address View project details and contacts
City, State (County) Brighton, MI 48116   (Livingston County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purchase and installation of a new scum pump at the Township's wastewater treatment plant. the replacement of a scum pump that has failed at the Township wastewater treatment plant located at 5901 Pleasant Valley Road, Brighton, MI 48116. The proposed scum pump must fit in the existing space in the clarifier. The Township prefers to utilize the existing motor, but will consider proposals to replace both the pump and the motor

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents