Similar Projects
Roosevelt High School (HS) - Interior Wall Repairs ONLY Prequalified
Renovation
Sub-Bidding
$47,000 CJ est. value
Chicago, IL 60632

Main Library Heating Boiler Upgrade
Renovation
Sub-Bidding
$900,000 CJ est. value
Evanston, IL 60201

Bridgeview Courthouse Tenant Improvements
Alteration
Post-Bid
Bridgeview, IL 60455

Insulation Removal and Minor Demo
Demolition, Alteration
Post-Bid
Chicago, IL

GSA - DOS Carpet and Paint at JCK Federal Building
Renovation, Term Contract
Results
Chicago, IL 60604

Vivian Gordan Harsh Apartment Interior
Renovation, Alteration
Results
Chicago, IL 60653

Escalator Handrail and Field Splicing
Term Contract, Alteration
Post-Bid
Chicago, IL

METRA Station Retractable Wall Design and Installation
Alteration
Results
Oak Park, IL 60301

Willow Grove Ceiling Replacement
Alteration
Post-Bid
Buffalo Grove, IL

Niles West Science Wing Curtain Wall and Windows
Alteration
Results
Skokie, IL 60077

Whiteboard Removal, Wall Restoration and Painting Services
Alteration
Post-Bid
Prospect Heights, IL

2022 Curtain Wall Replacement
Alteration
Results
Mount Prospect, Rolling Meadows, IL 60056

New Custom Lockers
Alteration
Post-Bid
Wheeling, IL

CPS Von Steuben HS Boys Lockers
Alteration
Results
Chicago, IL 60625

Program Consolidation Phase 1 - Casework Package
Alteration
Post-Bid
$200,000 est. value
Arlington Heights, IL 60005

Last Updated 04/10/2023 08:03 AM
Project Title

Moraine Valley Community College - Building D Entry

Physical Address View project details and contacts
City, State (County) Palos Hills, IL 60465   (Cook County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $357,455 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project Identification: Building D Entry Project Location: Moraine Valley Community College, 9000 West College Parkway, Palos Hills, Illinois 60465. Lump sum bid proposals will be received for this project at the scheduled time of receipt of bids and will be publicly opened at that time. Bid security in the form of a bid bond, certified check, or cash in an amount equal to ten percent (10%) of the base bid amount shall be submitted with the bid. Should a bid bond be submitted, the bid bond shall be payable to the Board of Trustees, Moraine Valley Community College. Please note that all college visitors are required to complete a health screening and maintain physical distancing. This includes all site visits and bid delivery to L-187. Signage on all external doors provide a QR code with directions for visitors to complete the Cleared4Class self-screening; or online. Based upon responses, visitors will receive a purple access pass, permitting them into college buildings, or a red screen, which prohibits their access to campus. Masking, at this time, will be optional. The College reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the College. Decisions of the College will be final. Minority and Women Owned Businesses are highly encouraged to participate. This Contract calls for the construction of a public work, within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (the Act). The Act Requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the prevailing rate of wages (hourly cash wages plus fringe benefits) in the county where the work is performed. For information regarding current prevailing wage rates, please refer to the Illinois Department of Labor's website at: http://www.illinois.gov/idol/Laws-Rules/CONMED/Pages/Rates.aspx. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including, but not limited to, all wage, notice, record keeping duties, and related Equal Employment Opportunity Laws. Failure to comply with said Act will result in penalties and fines. Date of Commencement: Work may commence on site on or after June 5, 2023, at 7:00 a.m. Date of Substantial Completion: Work must be substantially complete on or before July 28, 2023, at 11:59 p.m.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents