Similar Projects
Wildhorse Ranch Wastewater Treatment Plant Expansion
Addition
Conception
$35,000,000 est. value
Austin, TX 78653

Dessau Wastewater Treatment Plant Capacity Expansion
Addition
Conception
$8,650,000 est. value
Austin, TX

Motto Hotel by Hilton
New Construction, Infrastructure - 82,165 SF
Design
$15,000,000 CJ est. value
Austin, TX 78701

George Washington Carver Museum Cultural and Genealogy Center Phase 2A Site Utilities
Renovation, Addition, Build-Out, Infrastructure
Design
$5,100,000 est. value
Austin, TX 78702

Water Reclamation Facility Plant Farm Ponds Rehabilitation
Infrastructure
Bidding
$200,000 CJ est. value
Midland, TX 79701

Water Reclamation Facility Plant Farm Ponds Rehabilitation
Infrastructure
Bidding
$200,000 CJ est. value
Midland, TX 79701

Capitol Complex, Phase 2
New Construction, Infrastructure
Post-Bid
$225,000,000 CJ est. value
Austin, TX 78701

William Cannon Drive Phase 3
Infrastructure
Post-Bid
$370,000 CJ est. value
Austin, TX 78745

World-Wide Water Storage Tank Remediation
Term Contract
Results

North Waste Water Treatment Plant Headworks Replacement Project
Results
Austin, TX

BCRUA Phase 2 Raw Water Delivery System
Infrastructure
Construction
$224,786,835 CJ est. value
Cedar Park, TX 78613

BCRUA Phase 2 Raw Water Delivery System
Infrastructure
Construction
$224,786,835 CJ est. value
Cedar Park, TX 78613

Dutch Bros Coffee TX1202 / Austin
New Construction, Infrastructure - 871 SF
Pending Verification
$250,000 CJ est. value
Austin, TX 78754

QuikTrip #4190 / Manor
New Construction, Infrastructure - 4,993 SF
Pending Verification
$475,000 CJ est. value
Manor, TX 78653

South Austin Regional WWTP Trains A & B Improvements
Renovation
Conception
$78,230,000 est. value
Austin, TX 78799

Last Updated 12/22/2022 11:13 AM
Project Title

Flintrock Effluent Improvements Phase I

Physical Address View project details and contacts
City, State (County) Lakeway, TX 78734   (Travis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $10,870,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of a new effluent storage tank, pump station, piping, and associated site, electrical and instrumentation improvements adjacent to and connecting to the existing Flintrock WWTP, and approximately 5,300 lf of off-site 12 effluent line. The Engineer s estimate for this Project is $6,000,000. The prospective bidder s attention is directed to the Bid Documents where detailed instruction and provisions are contained concerning bidding requirements, bonds, insurance, and other Project requirements. As outlined in the Instructions to Bidders, bids must be accompanied by an acceptable bid security payable to the Owner equal to five percent (5%) of the total bid amount. . The CONTRACTOR shall provide all labor, materials, equipment, machinery, tools, materials, utilities, temporary facilities, and other needed items for the execution and completion of this Contract, where it is not specifically provided that the OWNER will furnish them. The CONTRACTOR is responsible for the protection, care, and conservation of all supplied items on any part of the Work until the OWNER has issued Final Acceptance of the Work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents