Similar Projects
Kitchen Exhaust Hood Cleaning and Maintenance Service
Term Contract
Design
Montrose, Wappingers Falls, NY 12590

Hudson Valley, Castle Point Chiller Plant Monitoring, Operation & Preventative Maintenance
Term Contract
Design
Wappingers Falls, NY 12590

HVAC Upgrades
Alteration
Post-Bid
Pine Plains, NY 12567

WPCP Rooftop HVAC Replacement-REBID
Renovation
Post-Bid
$80,000 CJ est. value
Poughkeepsie, NY 12601

Heating/Ventilation/Air Conditioning and Plumbing Work
Term Contract
Results
Poughkeepsie, NY

Municipal Center Trane HVAC Chiller and Installation
Alteration
Results
Beacon, NY

HVAC & Refrigeration Replacement & Maintenance For Lukoil Service Stations
Alteration
Post-Bid

On-Call Commercial and Industrial HVAC Contractor, Construction, Renovation, Preventive Maintenance Services
Term Contract
Results
NY

HVAC
Alteration
Post-Bid

Rehabilitate Kitchen Floor, Building 3 - HVAC
Alteration
Results
$25,000 to $50,000 est. value
Stormville, NY 12582

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

Job Order Contracts Region 3 - HVAC
Alteration
Results

H966--USP Compliant Pharmacy Certification/Lab BSC/Fume Hood Cert Base Year
Term Contract
Post-Bid
Castle Point, Montrose, NY 10548

Hudson Hall HVAC Improvements
Alteration
Results
Poughkeepsie, NY

2022-23 Facilities and Operations: Steam Trap Replacement Parts
Term Contract
Post-Bid
Hopewell Junction, NY

Last Updated 09/20/2022 06:32 AM
Project Title

Todd Hill Restroom Addition - HVAC

Physical Address View project details and contacts
City, State (County) Poughkeepsie, NY 12601   (Dutchess County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For Todd Hill Restroom Addition - HVAC. Bid Deposit $8,100. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of $50,000 for C, $8,100 for H, $16,700 for P, and $8,700 for E). All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $1,000,000 and $2,000,000 for C, between $50,000 and $100,000 for H, between $100,000 and $250,000 for P, and between $100,000 and $250,000 for E. Pursuant to New York State Executive Law Article 15-A and the rules and regulations promulgated thereunder, OGS is required to promote opportunities for the maximum feasible participation of New York State-certified Minority and Women-owned Business Enterprises ("MWBEs") and the employment of minority group members and women in the performance of OGS contracts. All bidders are expected to cooperate in implementing this policy. OGS hereby establishes an overall goal of 30% for MWBE participation, 15% for Minority-Owned Business Enterprises ("MBE") participation and 15% for Women-Owned Business Enterprises ("WBE") participation (based on the current availability of qualified MBEs and WBEs) for Construction Work and an overall goal of 20% for MWBE participation, 10% for Minority-Owned Business Enterprises ("MBE") participation and 10% for Women-Owned Business Enterprises("WBE") participation (based on the current availability of qualified MBEs and WBEs) for Plumbing Work. The total contract goal can be obtained by utilizing any combination of MBE and /or WBE participation for subcontracting and supplies acquired under this Contract. Trades with 0% goals are encouraged to make "good faith efforts" to promote and assist in the participation of MWBEs on the Contract for the provision of services and materials Liquidated Damages: Should Contractor fail to substantially complete the Work within the time frame set forth in the contract, or as described in a subsequent Order(s) on Contract, the Group Director may assess Liquidated Damages for such failure in the amount of $1,000.00 per day until such time as the Group Director determines that the Work is substantially complete as defined in Section 2.21 herein. Should Contractor fail to achieve physical completion of the work within the time frame set forth in the contract, the Group Director may assess Liquidated Damages for such failure in the amount of $500.00 per day until such time as the Group Director determines that the Work is physically complete as defined in Section 2.12 herein. The substantial completion date for this project is 171 days after the Agreement is approved by the Comptroller.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents