Similar Projects
Last Updated | 09/20/2022 06:32 AM |
Project Title | Todd Hill Restroom Addition - HVAC |
Physical Address | View project details and contacts |
City, State (County) | Poughkeepsie, NY 12601 (Dutchess County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $100,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For Todd Hill Restroom Addition - HVAC. Bid Deposit $8,100. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Each bid must be prepared and submitted in accordance with the Instructions to Bidders and must be accompanied by a bid security (i.e. certified check, bank check, or bid bond in the amount of $50,000 for C, $8,100 for H, $16,700 for P, and $8,700 for E). All successful bidders will be required to furnish a Performance Bond and a Labor and Material Bond pursuant to Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract estimated to be between $1,000,000 and $2,000,000 for C, between $50,000 and $100,000 for H, between $100,000 and $250,000 for P, and between $100,000 and $250,000 for E. Pursuant to New York State Executive Law Article 15-A and the rules and regulations promulgated thereunder, OGS is required to promote opportunities for the maximum feasible participation of New York State-certified Minority and Women-owned Business Enterprises ("MWBEs") and the employment of minority group members and women in the performance of OGS contracts. All bidders are expected to cooperate in implementing this policy. OGS hereby establishes an overall goal of 30% for MWBE participation, 15% for Minority-Owned Business Enterprises ("MBE") participation and 15% for Women-Owned Business Enterprises ("WBE") participation (based on the current availability of qualified MBEs and WBEs) for Construction Work and an overall goal of 20% for MWBE participation, 10% for Minority-Owned Business Enterprises ("MBE") participation and 10% for Women-Owned Business Enterprises("WBE") participation (based on the current availability of qualified MBEs and WBEs) for Plumbing Work. The total contract goal can be obtained by utilizing any combination of MBE and /or WBE participation for subcontracting and supplies acquired under this Contract. Trades with 0% goals are encouraged to make "good faith efforts" to promote and assist in the participation of MWBEs on the Contract for the provision of services and materials Liquidated Damages: Should Contractor fail to substantially complete the Work within the time frame set forth in the contract, or as described in a subsequent Order(s) on Contract, the Group Director may assess Liquidated Damages for such failure in the amount of $1,000.00 per day until such time as the Group Director determines that the Work is substantially complete as defined in Section 2.21 herein. Should Contractor fail to achieve physical completion of the work within the time frame set forth in the contract, the Group Director may assess Liquidated Damages for such failure in the amount of $500.00 per day until such time as the Group Director determines that the Work is physically complete as defined in Section 2.12 herein. The substantial completion date for this project is 171 days after the Agreement is approved by the Comptroller. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |