Similar Projects
Comprehensive Infrastructure for Tampa's Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Airport Stormwater Improvements
Bidding
Less than $571,000 est. value
Stuart, FL 34996

2021 Sanitary Sewer Lining
Bidding
$800,000 to $1,000,000 est. value
Palm Coast, FL

Mirada Active Adult Phase 1 (Mirada Boulevard Phase 3B)
Post-Bid
San Antonio, FL 33576

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

Stormwater Harvesting Pilot Project
Results
Less than $700,000 est. value
Middleburg, FL 32068

Gaberonne Swamp Stormwater Pensacola Bay Watershed Improvements Langley Avenue Diversion Box and Storm Conveyance Project
Results
Pensacola, FL 32502

Cured in Place Pipe for Stormwater Pipe Rehabilitation
Infrastructure
Bidding
Belle Isle, FL

Abandonment of Existing Septic System
Post-Bid
Orlando, FL 32805

Thomas Branch Stormwater Improvements
Results
Less than $1,103,397 est. value
Niceville, FL 32578

Edgewood Neighborhood Stormwater Improvements
Infrastructure
Bidding
Fort Lauderdale, FL

Blue Lake Elementary - Stormwater Drainage Upgrade
Post-Bid
De Land, FL 32724

Davis Highway at Carpenter's Creek (Northside) Stormwater Treatment Enhancement Project
Results
Less than $445,111 est. value
Pensacola, FL 32502

Storm Drain System Cleaning and Video Inspections
Term Contract, Infrastructure
Bidding
Redington Beach, FL

Front Street Complete Streets Project
Post-Bid
Melbourne, FL 32901

Last Updated 06/23/2021 03:24 AM
Project Title

Stormwater Drain Installation - SW 6th Street

Physical Address View project details and contacts
City, State (County) Homestead, FL 33030   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

All labor, materials, equipment, skills, tools, permitting cost, supervision, services and traffic control as necessary for proper completion of the storm drain installation. The Contractor shall protect all existing surfaces, any existing trees and lawn from damage. Maximum care should be taken while excavation to avoid damages to other underground services.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents