Similar Projects
I-294 Roadway and Bridge Reconstruction and Widening
Renovation, Infrastructure
Bidding
$100,000,000 est. value
Chicago, IL

Elevator Maintenance and Repairs Melvin Price Lock and Dam
Renovation, Alteration
Bidding
East Alton, IL

Lincoln Yards - Dominick Bridge
New Construction
Post-Bid
$35,000,000 est. value
Chicago, IL 60601

Bridge Replacement at Hawthorne Hills
Post-Bid
Elgin, IL

Grand Avenue Bascule Bridge and Viaduct Structural Repairs
Results
Less than $37,500,000 est. value
Chicago, IL 60602

Crab Orchard NWR Devils Kitchen Dam Aux Splway
Results
$500,000 to $1,000,000 est. value
Marion, IL

Mississippi River Lock and Dam Nos. 21 and 22 Kevel Rail Replacement
Renovation
Bidding
$5,000,000 to $10,000,000 est. value
Quincy, IL

2021 Bridge Repair Program
Post-Bid
Oswego, IL

CH 78 Bridge Rehabilitation
Results
Less than $562,483 est. value
Milan, IL

Bridge Beam Repairs Located on IL 171
Renovation
Bidding
$700,000 est. value
McCook, IL

Skyway 75th Avenue Bearing Pedestal
Renovation
Post-Bid
Chicago, IL 60707

Webster Avenue Bridge Over the North Branch of the Chicago River
Results
Chicago, IL

2022 Preventative Maintenance Project
New Construction, Infrastructure
Bidding
$600,000 est. value
Hoffman Estates, IL

Mccormick Ravine Public Access
New Construction
Post-Bid
Lake Forest, IL

Gregory Street Culvert Rehabilitation
Results
Normal, IL 61761

Reported 07/14/2022 03:52 PM
Project Title

East Evergreen Box Culvert - City of Effingham

Physical Address View project details and contacts
City, State (County) Effingham, IL 62401   (Effingham County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected April 2024
Bids Due View project details and contacts
Estimated Value $620,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. As of July 13, 2022, this project is included in the City of Effingham's FY 2023-2027 CIP and funding is allotted for FY 2023 and FY 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Dam/Tunnel, New Construction, Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Shoring, Special Foundations and Load-Bearing Elements, Driven Piles, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents