Similar Projects
Last Updated | 02/16/2023 12:11 AM |
Project Title | Erosion Repairs and Vehicle Barrier Install at Kawaihae Harbor |
Physical Address | View project details and contacts |
City, State (County) | Kawaihae, HI 96743 (Hawaii County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dock/Pier/Marine, Maintenance, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $314,952 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Erosion Repairs & Vehicle Barrier Installations at Kawaihae Harbor, Kawaihae, Hawaii. The scope of work consists of repairing eroded portions of the existing coral roadway edge, placing new concrete and fabricating, then installing new metal pipe wheel stops at a storage yard area at Kawaihae Harbor. Anything said at the pre-bid meeting is for clarification purposes and any changes to the bid documents will be made by addendum and posted in HIePRO. Contract Start and End Date shown in the HIePRO solicitation are estimates. The exact dates shall be provided by written notice from the Harbors Division Construction Engineer. The estimated cost of construction between $400,000.00 and $600,000.00. To be eligible for award, bidders must possess a valid State of Hawai General Engineering Contractor's "A" license at the time of bidding. The GENERAL PROVISIONS dated 2016 applicable to this project are available on the internet at website. All questions and requests for information (RFI) applicable to the bid documents shall be submitted via HIePRO no later than 14 calendar days before bid opening. Questions received after the deadline will not be addressed. Verbal RFI will not receive a response. Apprenticeship Preference. A 5% bid adjustment for bidders that are parties to apprenticeship agreements pursuant to 103-55.6, Hawaii Revised Statutes (HRS), is applicable to this project. Employment of State Residents on Construction Procurement Contracts. Compliance with 103B-3, HRS, is a requirement for this project whereby a minimum of 80% of the bidder's work force on this project must consist of Hawaii residents. Campaign Contributions by State and County Contractors. Contractors are hereby notified of the applicability of 11-355, HRS, which states that campaign contributions are prohibited from specified State or County government contractors during the term of the contract if the contractors are paid with funds appropriated by a legislative body. For more information, contact the Campaign Spending Commission at (808) 586-0285. Protests. Any protest of this solicitation shall be submitted in writing to the Director of Transportation, in accordance with 103D-701, HRS, and 3-126, Hawaii Administrative Rules. The Equal Employment Opportunity Regulations of the Secretary of Labor implementing Executive Order 11246, as amended, shall be complied with on this project. The U.S. Department of Transportation Regulation entitled "Nondiscrimination in Federally-Assisted Programs of the U.S. Department of Transportation," Title 49, Code of Federal Regulations (CFR), Part 21, is applicable to this project. Bidders are hereby notified that the State Department of Transportation will affirmatively ensure that the contract entered into pursuant to this advertisement will be awarded to the lowest responsible bidder without discrimination on the grounds of race, color, national origin or sex (as directed by 23 CFR, Part 200). For additional information, contact Mr. James Miller, Project Manager, by phone at (808) 587-1871, by fax at (808) 587-1864, or email at James.B.Miller@hawaii.gov. The State reserves the right to reject any or all proposals and to waive any defects in said proposals for the best interest of the public. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Completion Date: 300 Calendar Days. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |