Similar Projects
Kenmore Apartments Foot Drain Replacement
Infrastructure
Bidding
Warren, OH 44483

Jacking and Boring Services
Post-Bid

Jacking and Boring Services
Infrastructure
Post-Bid

Mosquito Stilling Basin Joint Sealing
Results
$100,000 to $250,000 est. value
Cortland, OH 44410

Reventment Bags and Erosion Control Mats
Results

Box Culverts
Infrastructure
Post-Bid

Culvert Invert Paving
Term Contract
Results

Concrete Pipes
Infrastructure
Post-Bid

Culvert Pipe Replacement and Concrete Restoration
Results
Niles, OH 44446

TRU-Mecca Street
Infrastructure
Post-Bid
Cortland, OH 44410

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Results

Masury SE - Drainage Improvements Project
Results
Brookfield, OH

Concrete Pipes
Term Contract
Results

Box Culverts
Term Contract
Results

Grandview Avenue Culvert Replacement Project
Results
Less than $513,320 est. value
Hubbard, OH 44425

Reported 02/01/2022 12:00 AM
Project Title

Mosquito Creek Rip Rap Extension

Physical Address View project details and contacts
City, State (County) Cortland, OH 44410   (Trumbull County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking information to assist in creating contract documents to extend the upstream riprap at the Mosquito Creek Dam, Cortland, Ohio. The existing riprap extends from the upstream toe of the embankment partially up the slope. The remainder of the slope is grass covered. The government intends to remove the existing vegetation protection and extend the riprap on the upstream slope to the embankment crest. - There are three potential work areas identified approximately 6,000 ft in total length (Phase I: 1700 LF, Phase II: 1750 LF and Phase III: 2600 LF): - Procure and deliver aggregate filter and riprap materials in sufficient quantities and frequency to prevent delays. - Work around and under the intake tower access bridge, including removal of vegetation and upper soil fill and placing filter and riprap materials. - Place filter and riprap around existing utility poles - Work around flowable fill used to backfill voids during previous removal of utility poles - Preserve the integrity of existing dam monitoring instrumentation (piezometers, settlement and alignment pins) along the upstream face and crest of the dam - Excavate and dispose of some of dam embankment materials for toe key and vegetated upstream dam facing - Extend an existing culvert located within the proposed work area

Details

Division 31 - Earthwork, Excavation and Fill, Fill, Backfill, Trenching and Backfilling, Erosion and Sedimentation Controls, Caissons, Excavated Caissons.
Division 32 - Exterior Improvements, Base Courses, Aggregate Base Courses.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents