Similar Projects
Forbes Avenue Gateway Park
New Construction
Conception
Pittsburgh, PA

Southside Works - Tunnel Park Playground and Dog Park
New Construction - 2,320 SF
Design
$500,000 to $1,000,000 CJ est. value
Pittsburgh, PA 15207

Regional Roundabout Screening Study Consultant Services
Post-Bid
Pittsburgh, PA

Prospect Park Phase I
New Construction
Post-Bid
Pittsburgh, PA 15207

McKinley Park Chicken Hill Green Infrastructure Project
Results
Pittsburgh, PA 15123

Design Activities are Limited to: Architectural Retaining Wall
Results
$7,500,000 to $9,999,999 est. value
PA

Hazelwood Green Plaza
New Construction - 86,196 SF
Construction
$4,975,000 est. value
Pittsburgh, PA 15207

Kaufmann's Grand on Fifth - Rooftop Ice Skating Rink
New Construction
Construction
$50,000 est. value
Pittsburgh, PA

2021 Roadway Seal Coating and Micro-Surfacing Programs
Post-Bid
Sewickley, PA

SR 3048, Noblestown Road Slide Remediation
Results
$1,000,000 to $2,499,999 est. value
PA

Invisible Ecologies
New Construction
Construction
$115,000 est. value
Pittsburgh, PA 15222

Wexford Run - Neely School Trail
Post-Bid
Wexford, PA 15090

Lowering of SR 2058 (Hulton Road)
Results
PA

SouthSide Works Town Center
New Construction - 16,632 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Pittsburgh, PA 15203

Avonworth School District Parking Lot
Post-Bid
Pittsburgh, PA 15237

Last Updated 09/06/2022 11:32 PM
Project Title

Townsend Parklet - City Of Pittsburgh

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15220   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2019
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans include renovation of sidewalks and a basketball court, new playground equipment with a required safety surface, fencing, lighting, disability access, landscaping and other improvements. As of October 17, 2018, this project is in the preliminary stages. The Pennsylvania Department of Conservation and Natural Resources approved a grant to fund construction. The mayors office has set aside an additional $450,000 in the 2019 capital budget for the project. Information bidding documents, a designer, or general contractor selection method are not determined. A firm timeline has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents