Similar Projects
Esplanade - Pavilion Building
New Construction - 45,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Pittsburgh, PA 15233

Jasmine Nyree Campus - Building A - Learning Center
Renovation - 27,054 SF
Conception
Pittsburgh, PA 15204

Community Center
New Construction - 6,860 SF
Design
$850,000 est. value
Pittsburgh, PA 15224

City Club Apartments - Wood Street / Pittsburgh
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Pittsburgh, PA 15222

Prestigious Hills
Renovation - 133,515 SF
Post-Bid
$9,000,000 est. value
Pittsburgh, PA 15221

Whitehall Pool Improvements
Infrastructure
Post-Bid
Pittsburgh, PA

North Park Baby Pool Renovation
Infrastructure
Results
$200,000 est. value
Allison Park, PA 15101

Township Pool Improvements
Infrastructure
Results
Carnegie, PA 15106

Connection @ South Side
New Construction - 356,750 SF
Construction
$59,800,000 est. value
Pittsburgh, PA 15203

Connection @ South Side
New Construction - 356,750 SF
Construction
$59,800,000 est. value
Pittsburgh, PA 15203

Frosty Valley Clubhouse Renovations
New Construction, Build-out
Pending Verification
$500,000 CJ est. value
Upper Saint Clair, PA 15241

Jasmine Nyree Campus - Building B - Community Center
Renovation - 33,632 SF
Conception
Pittsburgh, PA 15204

Linton Middle School (LMS ) Natatorium HVAC Upgrade (Mechanical and Electrical Construction)
Renovation
Post-Bid
$280,000 CJ est. value
Pittsburgh, PA 15235

Mooncrest Community Center Interior Renovations - General Construction
Renovation
Results
$200,000 est. value
Coraopolis, PA 15108

Wildwood Country Club
Addition
Construction
$4,000,000 est. value
Allison Park, PA 15101

Last Updated 03/16/2023 04:07 PM
Project Title

The Kingsley Association Pool Renovation

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15206   (Allegheny County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 16, 2023, the project is in final planning. No building permits have been submitted into the City of Pittsburgh. Information regarding the architect and general contractor has not been disclosed. A firm construction timeline has not been set; however, construction is not expected to begin prior to summer 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents