Similar Projects
Interquest Parkway Parking Lot
New Construction
Design
Colorado Springs, CO 80921

Cow Quiet Zones
Post-Bid
Westminster, CO 80031

Pkaa, Klondike Basin Project (644E)
Post-Bid
CO

SRTS Thunder Valley Trail
Results
Less than $1,093,992 est. value
Frederick, CO 80530

2019 Fish Pond Trail Extension
Results
Sterling, CO 80751

Polo Club Place Drainage and Roadway
Renovation
Construction
Denver, CO

Travel Centers Of America Addition
New Construction - 5,600 SF
Pending Verification
Commerce City, CO 80022

Curb Repair for Holly Lot - Ahec-20402-D
Post-Bid
Denver, CO

2019 Concrete Replacement Program
Results
$135,000 to $165,000 est. value
Aurora, CO 80012

2019 Sidewalks Project
Post-Bid
Highlands Ranch, CO

2019 Citywide Concrete Spot Repairs, Phase 2
Results
Less than $495,082 est. value
Denver, CO 80202

2020 Concrete Replacement
Post-Bid
Lone Tree, CO

Needham Elementary Connect Phase II
Results
Less than $1,000,000 est. value
Durango, CO

Construction of the Safe Routes to School
Post-Bid
Gunnison, CO

South Federal Raised Medians project
Results
$1,000,000 to $5,000,000 est. value
CO

Last Updated 10/30/2020 11:45 AM
Project Title

North Wilson Avenue Sidewalk and Connecting Pathways to Ponderosa Safe Routes to School

Physical Address View project details and contacts
City, State (County) Loveland, CO 80537   (Larimer County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $535,895
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pedestrian improvements to increase safety of students walking and riding to Lucile Erwin Middle School and Ponderosa Elementary School in Loveland, Colorado. Detached sidewalk and multiuse trail on the west side of North Wilson Avenue between W. 35th Street and W. 43rd Street. Detached sidewalk and enhanced pedestrian crossing on Kincaid Drive between Radford Avenue and Thorn Circle.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents