Similar Projects
Replacement of Bathroom Fans
Bidding
Less than $40,000 est. value
New Bedford, MA

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Remove Two Existing Roof-Top Mechanical Units From Roof Of Fairhaven High School Gymnasium And Replace With Two New Hvac Roof-Top Units - General Bids
Post-Bid
$265,000 est. value
Fairhaven, MA 02719

Plymouth Street Fire Improvements: Roofing, HVAC and Windows - Filed Sub-Bids
Results
$700,000 est. value
Mansfield, MA 02048

Heating System On-Call Routine and Emergency Repair Services
Results
Less than $77,000 est. value
New Bedford, MA

Remove Two Existing Roof-Top Mechanical Units From Roof Of Fairhaven High School Gymnasium And Replace With Two New Hvac Roof-Top Units: Hvac - Filed Sub-Bids
Post-Bid
Fairhaven, MA 02719

Installation of Emergency Vehicle Exhaust Fume Removal System
Results
North Dighton, MA 02764

Annual HVAC Preventative Maintenance and Repair Services
Term Contract
Post-Bid
North Attleborough, MA

Mansfield High School Window and Door Replacement - Filed Sub Bid
Results
Less than $1,678,587 est. value
Mansfield, MA

Brewster Mini - TRD HVAC
Post-Bid
Taunton, MA

Source Capture Emergency Vehicle Exhaust Fume Removal System for Fire Station 3
Results
East Freetown, MA 02717

HVAC Cleaning at Taunton State Hospital
Post-Bid
Taunton, MA

Emergency Exhaust Fume Removal System
Results
Less than $40,000 est. value
North Dighton, MA 02764

HVAC/R Services
Term Contract
Post-Bid
Less than $2,000,000 est. value

Lawler Library - HVAC System Replacement
Results
Less than $84,000 est. value
New Bedford, MA

Last Updated 02/12/2019 06:05 AM
Project Title

Air Conditioning Replacement at Capron Park Zoo

Physical Address View project details and contacts
City, State (County) Attleboro, MA 02703   (Bristol County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. Furnish and install appropriate sized air conditioning system on existing furnaces while using existing duct work. Work to include all refrigeration piping, duct work modifications, electrical work by licensed electrician, permits, thermostat, and all other necessary work and materials. 1. Install (1) new 4MXS36 Daikin 17 seer mini split heat pump system with (1) Multi zone outdoor condenser and (3) FTXS12 indoor Daikin wall mounted heads providing space temperature control with hand held remote controllers. 2. Place indoor heads on 3 walls inside rainforest areas and outdoor condenser on ground on side of building on stand. 3. Hammer drill through wall of where the indoor units are going and run all new line sets, drain lines, and control wiring along roof to where condenser will be located on ground. 4. Install new power supply disconnect, power whip for outdoor condenser and run new main power wiring to new condenser from existing main power panel. 5. Supply a (1) year parts and labor warranty on work performed and units come with a factory warranty of (12) years on parts. 6. Install metal covering to go over indoor units to keep irrigation water out.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents