Similar Projects
Rock Creek Park Trail and Pedestrian Bridge
Post-Bid
Washington, DC 20003

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

The Baltimore-Washington SCMAGLEV Project
Conception
$15,000,000,000 est. value
Washington, DC - Baltimore, MD

Construction Contract to Perform R -Tunnel Repair Work - AOC Step 2
Post-Bid
$5,000,000 to $10,000,000 est. value
Washington, DC 20003

WMATA L-Line Steel Tunnel Liner Rehabilitation and Bridge Structure Repairs Project
Post-Bid
$100,000,000 to $250,000,000 est. value
Washington, DC 20001

FHWA-EFLHD 2020 Industry Day
Post-Bid
Washington, DC

CPP-UDS IDIQ Contract -Structural Repairs & Tunnel Improvements (2021-2026)
Design
Washington, DC

W912dr21b0007 | Third High Reservoir
Design
Less than $2,800,000 est. value
Washington, DC 21201

Tunnel Ventilation Pilot Program - Design-Build Services
Post-Bid
Washington, DC

WMATA Rockville Canopy and Bridge Rehab
Results
$40,000,000 to $65,000,000 est. value
Washington, DC - Hyattsville, Rockville, MD - Alexandria, VA 20850

Platform Rehabilitation Program Contract 4
Renovation
Bidding
Washington, DC - Washington, PA 20001

Citywide Open-End Bridge Design Consultant Services
Post-Bid
Washington, DC 20009

Reported 04/08/2021 12:00 AM
Project Title

Yellow Line Tunnel and Bridge Rehabilitation - Construction Management at Risk (CMAR) Services

Physical Address View project details and contacts
City, State (County) Washington, DC   (District of Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Dam/Tunnel
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction firms qualified to perform Construction Manager at Risk (CMAR) professional and technical services required for four (4) Phase 2 Construction Work Packages further described as Phase 1 Preconstruction Services.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Shoring, Special Foundations and Load-Bearing Elements, Driven Piles, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents