Similar Projects
Storm Drain Improvements
Infrastructure
Bidding
$1,800,000 est. value
Lexington, MA 02421

Valleyfield Grassland and Waltham Street Drainage Improvement
Infrastructure
Bidding
Lexington, MA 02421

Culvert Rehabilitation at Hudson Road and Walcott Street
Post-Bid
$175,000 est. value
Stow, MA 01775

1,400 Linear Feet of Retaining Wall Blocks
Post-Bid
Hudson, MA

Drilling IDIQ in Massachusetts and Rhode Island
Results

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Results
Less than $2,022,520 est. value

2021 Drainage Structure Cleaning Project
Term Contract
Post-Bid
$165,000 est. value
Watertown, MA

Market Street Daylighting Project
Results
$1,200,000 est. value
Everett, MA 02149

Supply Custom Concrete Culvert and Drainage Structures to Town Contractor
Infrastructure
Post-Bid
Lexington, MA

Elm Street Drainage Improvements Project
Results
North Reading, MA

Pre-Cast Drainage Structures
Infrastructure
Post-Bid
Lexington, MA

Scheduled and Emergency Cleaning, Inspection, and Repairs of Water Quality Control Structures (WQCS) in the I-90 and I-93 Tunnels
Results
Less than $734,644 est. value

Drainage Structure Cleaning
Infrastructure
Post-Bid
$70,000 est. value
Winchester, MA

Dana Court 200-3 16 Sewer Pipe Drains Replacement Project
Results
$13,938 est. value
Waltham, MA 02453

Wastewater and Drainage Materials for Construction
Infrastructure
Post-Bid
Framingham, MA

Reported 03/12/2022 12:00 AM
Project Title

Sucker Brook Culvert Project

Physical Address View project details and contacts
City, State (County) Pepperell, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Fabrication of 1) a 16-foot-wide, 8-foot-high, 33.9-foot-long open-bottom precast concrete box culvert; 2) precast strip footings for the culvert; and 3) optional approach slabs for replacement of the Heald Street culvert over Sucker Brook in Pepperell, MA.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents