Similar Projects
HVAC Systems for Head Start Sites
Bidding
Gainesville, Wichita Falls, TX 76240

Emergency Generator Replacement, Heat Sensors, HVAC Replacement
Bidding
$3,601,783 est. value
Abilene, TX 79602

Chiller Inspections and Repairs for Rusk State Hospital
Post-Bid
Rusk, TX 75785

HVAC Mechanic Services
Term Contract
Post-Bid
Lufkin, TX 75904

HVAC Maintenance and Supplies for 2019-2020
Term Contract
Results
Tuscola, TX 79562

HVAC Services
Results
Abilene, TX 79603

Hvac Replacement, Abilene DHQ
Bidding
$525,000 est. value
Abilene, TX 79601

Chiller and Boiler Mechanic Services
Term Contract
Post-Bid
Lufkin, TX 75904

HVAC System Replacement
Results
$591,846 est. value
Abilene, TX 79602

Exhaust Hoods Cleaning & Certification Services
Bidding

Heating, Ventilation and Air Conditioning (HVAC) Maintenance and Repair Services
Post-Bid
Lufkin, TX 75901

City Hall Air Duct/HVAC Remediation Project
Results
$95,306 est. value
Abilene, TX 79601

HVAC Abilene - 2 Carrier Units
Bidding
Abilene, TX

McBay Freezer Construction Project
Post-Bid
Mexia, TX 76667

Hodge Unit: Install Permanent Air Conditioning - J1 - J4 Dorms
Results
$4,949,000 est. value
Rusk, TX 75785

Last Updated 04/16/2021 11:22 AM
Project Title

Building Automation System (BAS) Replacement - North Texas Region

Physical Address View project details and contacts
City, State (County) Abilene, Mexia, Pollok, Rusk, Wichita Falls, TX 75969 (Angelina, Cherokee, Limestone, Taylor, Wichita Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,791,763
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing TAC Vista Building Automation System (BAS) software which controls the HVAC system for the facilities listed above, operates on the Windows 7 platform that is no longer supported by Microsoft. In addition, the current BAS software is also obsolete and not compatible with a Windows 10 operating system, thus requiring a full replacement. The new BAS control system and sequences of operation will be designed to accommodate the existing mechanical HVAC building systems, equipment, and utilities. The existing primary network between building controllers, BAS server and/or central operator workstation PC shall be based upon BACnet/IP. Owner is pursuing an open platform system as defined by the American Society on Heating, Refrigerating, and Air Conditioning Engineers (ASHRAE) that can reside overtop of existing controls system but provide a non-vendor dependent path forward with the ASHRAE standard. ASHRAE standard 135 has been established as the industry defining body and standard governing Building Automation Systems. The standard promotes an open standard language (protocol) across its devices. Site Visit on 09/15/2020 and 09/22/2020 at 9:00 AM at 6844 Highway 69 North, Pollock, Texas 75969, 09/16/2020 and 09/23/2020 at 9:00 AM at 805 North Dickinson Drive Rusk, Texas 75785, 09/17/2020 and 09/24/2020 at 9:00 AM at 540 Chapel Drive, Mexia, Texas 76667, 09/15/2020 and 09/22/2020 at 9:00 AM at 6515 Kemp Boulevard, Wichita Falls, Texas 76308 and 09/16/2020 and 09/23/2020 at 9:00 AM at 2501 Maple, Abilene, Texas 79602.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents