Similar Projects
Sewer Main Maintenance
Term Contract
Post-Bid
Belcourt, ND

Paving, Sanitary Sewer, Storm Sewer, Water Main Improvements
Post-Bid
$3,000,000 to $3,500,000 est. value
Valley City, ND

Sanitary Sewer, Water Main, Storm Sewer, Paving and Incidentals
Results
Less than $1,971,919 est. value
Fargo, ND 58102

East Side Sanitary Sewer Phase B - Part 1
Results
Wahpeton, ND

NDSCS Northwest and Southeast Apartments Sanitary Sewer and Vent Piping Replacement
Post-Bid
Wahpeton, ND 58075

Sanitary Sewer Replacement
Results
$5,250,000 est. value
Ashley, ND

Pipe Outfall Cleaning and Inspection
Infrastructure
Post-Bid
$259,900 est. value
Minot, ND

Sewer Utility Project No.83
Results
$45,500 to $54,250 est. value
Bismarck, ND

2021 North Sinkhole Filling AML
Infrastructure
Post-Bid
$40,000 est. value
Bismarck, ND

Sewer Utility Project No. 80
Results
$690,483 to $805,564 est. value
Bismarck, ND

Loy Avenue and 12th Street North
Infrastructure
Post-Bid
$2,762,300 est. value
Wahpeton, ND 58075

Sewer Utility Project No. 78
Results
$116,500 to $136,100 est. value
Bismarck, ND

Lift Station Sanitary Trunk Line
Results
$320,000 est. value
Lincoln, ND

Sanitary Sewer/Watermain/Storm Sewer/Paving and Street Lighting
Results
$2,810,069 est. value
Grand Forks, ND

2021 Country Estates Sewer Improvements
Results
$332,000 est. value
Stanley, ND

Last Updated 11/12/2021 01:14 AM
Project Title

2nd Avenue Sanitary Sewer Extension

Physical Address View project details and contacts
City, State (County) Cavalier, ND 58220   (Pembina County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, equipment, other facilities, and items necessary or incidental to 2nd Avenue Sanitary Sewer Extension. Contract No.1 – General Construction. The Work for the Contract is generally described as follows: 1. Contract No. 1 – General Construction: Work on 2nd Avenue Sanitary Sewer Extension generally consists of: •Gravity collection system improvements, including construction of five (5) manholes and approximately 1,480 lineal feet of 8-inch polyvinylchloride (PVC) gravity sewer pipe and 555 lineal feet of 4-inch PVC individual sewer service leads with caps, draining toward the north and east, where the connection to the existing sewer will be made. Crossing of Division Avenue will be done using trenchless installation of 90 lineal feet of 8-inch PVC gravity sewer; backfilling and surface restoration; and seeding. •Application for and obtaining stormwater permit and pollution prevention measures implementation, maintenance and permit compliance for construction period.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents