Similar Projects
Lockheed Martin Wastewater Tie-On Modified - Phase 1
Infrastructure
Conception
$1,000,000 est. value
Marietta, GA 30060

Water System Improvements FY2021 CDBG
Infrastructure
Bidding
$200,000 est. value
Hogansville, GA

Hamilton Road Utilities Relocation
Infrastructure
Bidding
$300,000 est. value
Lagrange, GA 30261

Russell Creek 30-inch Raw Water Pipeline
Post-Bid
Dawsonville, GA

Purchase of Water Meters on an Annual Contract
Post-Bid
Lawrenceville, GA

Replacement and Installation of Fire Hydrants Standby-Miscellaneous Construction
Results
Less than $100,000 est. value
GA 30303

New Water Meter Installation Project
Results
Less than $1,960,250 est. value
Gainesville, GA 30501

New Well, Chemical Feed Building and Water System Improvements
New Construction, Infrastructure
Bidding
$720,000 est. value
Attapulgus, GA

Automated Metering Infrastructure
Post-Bid
Temple, GA

Force Main Replacement Phase 1
Results
Buford, GA 30518

SR 16 at SR 54 Water Main Relocation
Infrastructure
Bidding
$310,000 est. value
Newnan, GA 30264

2021 City Wide Meter Project
Post-Bid
Baxley, GA

Dunbar Road Water Main Extension
Results
Warner Robins, GA 31095

Bear Branch Remote Well Addition Raw and Potable Water Mains
Infrastructure
Bidding
$2,000,000 est. value
Perry, GA

Installation of Water and Wastewater Infrastructure
Term Contract
Post-Bid
GA 31543

Last Updated 07/12/2022 02:30 PM
Project Title

Lower Dissolved Oxygen Plant Pipe Stabilization

Physical Address View project details and contacts
City, State (County) Savannah, GA   (Chatham County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest, Bidding Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Purpose of this project is to stabilize the discharge pipes that deliver dissolved oxygen to the Savannah (Front) and Back Rivers from the Lower Dissolved Oxygen Plant on Hutchinson Island in the City of Savannah: Scour areas adjacent to and beneath the discharge pipes on the Savannah River and Back River will be filled with like materials from nearby dredge spoil areas. In addition, a pipe expansion joint on the discharge pipe to the Savannah River will be replaced to allow full range of movement landward.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents