Similar Projects
Chandler (1300 Block) Reconstruction - 107.24.02 - City of Danville
Infrastructure
Conception
$400,000 CJ est. value
Danville, IL 61832

Chandler (1300 Block) Reconstruction - 107.24.02 - City of Danville
Infrastructure
Conception
$400,000 CJ est. value
Danville, IL 61832

Construct Two New Green Homes 7 and 8 Minor Construction - Danville VAMC
New Construction, Infrastructure - 12,116 SF
Bidding
$20,000,000 CJ est. value
Danville, IL 61832

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RR-21-4821 Pavement Repairs
Infrastructure
Results

Jackson/Voorhees Intersection Improvements and Realignment
Infrastructure
Results
Danville, IL 61832

Concrete Pad with Downspout/ Drainage Tile Work
Infrastructure
Construction
$70,000 CJ est. value
Bismarck, IL 61814

Rebuild Downtown and Mainstreets Project - 107.24.03 - City of Danville
Infrastructure
Conception
$3,000,000 CJ est. value
Danville, IL 61832

2022 Concrete Pavement Patching
Infrastructure
Post-Bid
$200,000 est. value
Danville, IL

West Madison Street Reconstruction
Infrastructure
Results
Danville, IL 61832

Poland Road Sewer Relocations - 402.24.04 - City of Danville
Infrastructure
Conception
$500,000 CJ est. value
Danville, IL 61834

Construct Parking Lot/Street Lighting GH Area at Illiana VA - Rebid
Infrastructure, Renovation
Post-Bid
$745,000 CJ est. value
Danville, IL 61832

Section Street Overlay
Infrastructure
Results
Danville, IL 61832

5th Street Pump Station Elimination - 402.24.05 - City of Danville
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Danville, IL 61832

Last Updated 04/30/2023 04:01 AM
Project Title

Standard Overlay, Cold Milling,Guardrail, Culvert Replacement, ADA Improvements

Physical Address View project details and contacts
City, State (County) Danville, IL 61832   (Vermilion County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,915,403 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

8.231 miles, 3P Policy Standard Overlay, Cold Milling, Guardrail, Culvert Replacement, ADA Improvements. Region 3 District 5 Federal Project # NHPPJF6C(825) County(s) Vermilion Key Route(s) FAP 332 Marked Route(s) IL 1 Section(s) 48RS-6&(48Z-2)RS-3&(48X-3)CR State Job #(s) C-95-022-11 PPS #(s) 5-53968-0000 5-53968-0200 115 Working Days Questions not accepted as of April 18, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov PID- C-95-022-11 Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 030 - Standard Overlay, Cold Milling,Guardrail, Culvert Replacement,ADA Improvements - IL 1 DBE (6.00%) The Contractor shall complete the work within 115 working days.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents