Similar Projects
Indian Tree Golf Club Improvements
New Construction, Renovation, Addition
Design
Westminster, CO 80005

Z2dz--554-22-148 Repair Concrete Curbs, Walkways, and Ramps
Term Contract
Design
$25,000 to $100,000 est. value
Aurora, CO 80045

Curb and Gutter Replacement
Infrastructure
Bidding
CO

Safe Water Action Program General Contractor
Infrastructure
Bidding
Fort Collins, CO

Peaks to Plains: Clear Creek Canyon Trail Phase 2
Post-Bid
CO

Cooper Place Extension
Post-Bid
Pueblo, CO 81001

Z--BLCA 208769 Road & Parking Lot Striping
Results
Montrose, CO

2020 Safe Routes to School - Pierce Street Project
Results
$300,000 to $350,000 est. value
Edgewater, CO 80214

700 Wood Street Entrance Improvements
Infrastructure
Bidding
Fort Collins, CO 80521

Improvements of Walkways, Curbs, Trails and Parking Lots at Five Parks
Post-Bid
Evergreen, CO 80439

Palmer Lake Library Ramp
Results
Palmer Lake, CO 80133

LC Parking Lot Maintenance
Infrastructure
Bidding
Fort Collins, CO 80526

Concrete Replacement Program
Post-Bid
Thornton, CO

Fountain Creek at Hanson Trailhead Project
Results
$1,750,000 to $2,100,000 est. value
Colorado Springs, CO 80903

Pueblo West Tap Trail 3
Infrastructure
Bidding
Pueblo West, CO

Last Updated 02/23/2022 09:25 AM
Project Title

27th Street Pedestrian Underpasses Construction

Physical Address View project details and contacts
City, State (County) Glenwood Springs, CO 81601   (Garfield County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes 220 lineal square feet of concrete pedestrian underpasses, 9 site retaining walls, 7 landscape walls, 1581 lineal feet of trails/sidewalks, stormdrain network, traffic signal improvements, temporary and final roadway construction, lighting and landscaping elements as well. The project includes the relocation of several utilities in conflict with site improvements as well as the coordination of third party utilities and their relocations.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents