Similar Projects
Resurfacing Public Works Parking Lot Phase Two
Alteration
Bidding
$155,000 est. value
Addison, IL

Multiple Elementary Schools Parking Lot Reconstruction Work
Infrastructure
Bidding
$270,000 est. value
Darien, IL

2021 Hardscape Improvements
Post-Bid
Aurora, IL 60504

2021 Sidewalk and Concrete Street Repair Program
Post-Bid
Glen Ellyn, IL

Addison Campus Parking Lot Improvements
Results
Addison, IL 60101

York Track Resurfacing and Renovations
Results
Less than $1,500,000 est. value
Elmhurst, IL 60126

Village Hall Parking Lot Expansion and Lisle-Woodridge Fire Station #52 Parking Lot Rehabilitation
Post-Bid
Woodridge, IL

2021 Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement Program
Term Contract
Results
Darien, IL 60561

2021 District Wide Bio-Based Parking Lot and Trail Sealcoating
Post-Bid
Naperville, IL

2021 Carriage Hill Park Pathway Replacement
Results
Lisle, IL

2021 District Wide Emulsion-Based Parking Lot and Trail Sealcoating
Post-Bid
Naperville, IL

Sidewalk
New Construction
Results
Less than $261,687 est. value
IL

2021 Sidewalk Sawing
Post-Bid
Naperville, IL

2021 Parking Lot Resurfacing and Asphalt Roadway Patching Program
Results
Glen Ellyn, IL

2021 Frontier Sports Complex West Asphalt Trail
Post-Bid
Naperville, IL

Reported 04/30/2022 12:00 AM
Project Title

CH 2 and CH 38 (Hobson Road and 63rd Street) Sidewalk

Physical Address View project details and contacts
City, State (County) Woodridge, IL 60517   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

New sidewalk installation, earthwork, drainage system revisions, new retaining walls, and the upgrade of existing traffic signals at the Hobson Road at Woodridge Drive intersection and the 63rd Street at I-355 entrancre ramp and exit ramp intersections in Woodridge, Illinois, includes 133 unit tree removal; 959 cu yd furnished excavation, 419 cu yd earth excavation; 21 cu yd removal and disposal of unsuitable material; 3 cu yd trench backfill, 2,036 cu yd topsoil excavation and placement; 4,319 sq yd sodding, 1,041 sq yd sodding, salt tolerant; 4,150 ft perimeter erosion barrier; 28 inlet filters; 3,773 sq yd aggregate base course, type b 2"; 1,276 lb bituminous materials (prime coat); 106 lb bituminous materials (tack coat); 36 ton HMA binder course; 36 ton HMA surface course; 24,789 sq ft PCC sidewalk 5"; 717 ft combination curb and gutter removal; 277 sq ft sidewalk removal; 130 sq ft median removal; 1,486 sq ft segmental concrete block wall; 130 ft storm sewers class A; 5 ea inlets type A; 4 ea manholes; 717 ft combination concrete curb and gutter; 38 ft steel plate beam guardrail; 580 ft thermoplastic pavement marking line; 271 ft underground conduit, galvanized steel; 9 handholes; 7,943 ft electric cable in conduit, signal; 16 ft concrete foundation; 1 ea temporary traffic signal installation; 2,620 ft remove electric cable from conduit; 460 ft pedestrian rail; 454 ft sewer removal; 451 ft concrete coping; federally funded.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents