Similar Projects
Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade to 12" Main on 12th Street Marian to Laird - City of Hastings
Infrastructure
Conception
$300,000 CJ est. value
Hastings, NE 68901

WashTech Car Wash / Hastings
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Hastings, NE 68901

Heartwell Renewables - Highway 6 Access Drives
Infrastructure
Bidding
$300,000 CJ est. value
Hastings, NE 68901

Furnish and Install a Concrete Offset Lane and Asphalt Temporary Exit
Infrastructure
Bidding
$300,000 CJ est. value
Hastings, NE 68901

Lochland Country Club Poolhouse
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$250,000 CJ est. value
Hastings, NE 68901

GTS Officers Quarters Building 635
New Construction, Infrastructure
Post-Bid
$366,800 CJ est. value
Hastings, NE 68901

Water Main Improvement
Infrastructure
Results
Hastings, NE 68902

District 4 On-Call Util Location Service
Infrastructure
Results
Less than $5,000,000 est. value

Heartwell Renewables Diesel Production Plant
New Construction, Infrastructure
Construction
$10,000,000 CJ est. value
Hastings, NE 68901

Replace and Upgrade Main on Marian Road from 7th Street to 9th Street - City of Hastings
Infrastructure
Conception
$350,000 CJ est. value
Hastings, NE 68901

Lakeview 10th Water and Sewer Additions
Infrastructure
Bidding
$200,000 CJ est. value
Hastings, NE 68901

Construction of Feeder 242 and Installation of Underground Feeders
Infrastructure
Post-Bid
$300,000 CJ est. value
Hastings, NE 68901

Watermain and Service Replacements
Infrastructure
Results
Hastings, NE

7th Street - Chestnut Avenue to Oswego Avenue - City of Hastings
Infrastructure
Conception
$390,000 CJ est. value
Hastings, NE 68901

Last Updated 12/09/2022 07:33 AM
Project Title

New Water Main on 2nd Ave, 2nd St. to 5th St.

Physical Address View project details and contacts
City, State (County) Hastings, NE 68901   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $175,766 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

New Water Main on 2nd Ave, from 2nd St. to 5th St Install new 8" water main via directional drilling. Each bid shall be accompanied by a certified check, drawn on a solvent bank in the State of Nebraska, or a bid bond in an amount of not less than five percent (5%) of the total bid of all contract construction costs, made payable to the City Treasurer of the City of Hastings, Nebraska, as security that the bidder to whom the contract may be awarded will enter into a contract to build all the improvements in accordance with this notice and give bond in the sum hereinafter provided for the construction of improvements. No bid shall be withdrawn after opening of bids without the consent of the City of Hastings, Nebraska, for a period of sixty (60) days after scheduled time of closing bids. Time is of the essence in this contract. In evaluating bid(s) received, the City will consider the timelines of completion of prior construction contracts, existing workload of bidders and available manpower that bidder commits to the project. The successful bidder will be required to furnish a Maintenance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Maintenance Bond. General Questions or Requests-Renae Griess Engineering Admin Assistant Ph# 402-462-3665 Email: bidquestions@cityofhastings.org he Contractor shall provide all labor, equipment, materials, and appurtenances necessary to complete the work as described on the drawings. This contract is part of proposed work to be completed and therefore coordination between the projects must be executed. Contractor to identify all utility crossings along the proposed water main alignment. Contractor to provide a pipe installation plan profile which identifies all buried obstacles along with a bore plan and bore log. The intent of these contract documents, specifications, drawings, and appendix are to provide the Contractor a description of the proposed work. The following items of work will be furnished by the Owner or other Contractors: 1. Owner will perform soil compaction testing.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents