Similar Projects
Last Updated | 09/17/2021 02:25 PM |
Project Title | Dryer 1 Ring and Pinion Gear Replacement and Alignment at the Jones Island Water Reclamation Facility |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI 53207 (Milwaukee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Dryer 1, the Contractor will remove the existing ring and pinion gears, assess their capabilities to provide continuous service, and reinstall in a flipped alignment if deemed worthy of ongoing service. The scope of work includes performing an alignment survey that includes the rotary drum, tires, trunnions, bearings, thrust rollers, motors, and gears, including backlash. The Contractor will determine the roundness of the rotary drum, tires, trunnions, and gears to assess their long-term integrity and will address any alignment concerns to optimize the dryer operation and reduce premature equipment wear. Also, the Contractor will recondition the surfaces of both inlet and outlet tires and all four (4) trunnions. The Contractor will complete work within 200 days after the Notice to Proceed |
||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |