Similar Projects
19th Avenue South East / Lakeland Drive South East Mill and Overlay
Infrastructure
Bidding
$195,000 est. value
Willmar, MN 56201

1st Street NorthEast / Business 71 Mill and Overlay
Infrastructure
Bidding
$570,000 est. value
Willmar, MN

North Smoky Hills Graveling
Renovation
Post-Bid

CSAH 44 Grading and Aggregate Base
Post-Bid
MN

Grading, Bituminous And Concrete Surfacing, Ada Improvements, Tension Cable Guardrail, And Lighting Concrete Pavement Rehabilitation And Diamond Grinding
Results
MN

2021 CSAH 8 and Progress Circle Utility Improvements
Results
$231,000 est. value
Spicer, MN

McMenemy Street Improvement
Infrastructure
Bidding
Maplewood, MN

Sewer Vacuum, Hydro-Excavation, and Municipal Pumping Equipment
Alteration
Post-Bid

Rubberized Asphalt Crack Filling
Results
MN

Remove Bituminous Pavement
Infrastructure
Bidding
$410,000 est. value
Hawick, MN

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Bituminous Seal Coat
Results
MN

2022 Improvement Project
Infrastructure
Bidding
$330,000 est. value
New London, MN

CF-22, Rubberized Asphalt Crack Filling
Infrastructure
Post-Bid
MN

2021 Bituminous Surfacing
Results
$2,647,890 est. value
Willmar, MN

Last Updated 04/13/2022 09:47 AM
Project Title

Bituminous Milling, Full Depth Reclamation, Bituminous Surfacing, Storm Sewer

Physical Address View project details and contacts
City, State (County) Willmar, MN   (Kandiyohi County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Location: CSAH 41 from Park Ave to CSAH 24 Project SAP 034-641-010, CSAH 41 from 75’ north of Park Avenue to 350’ south of CSAH 24 (Bit. Milling, Full Depth Reclamation, Bit. Surfacing, Storm Sewer) Combined estimated quantities of work are: Remove Bituminous Pavement – 3255 SQYD, Remove Concrete Walk – 136 SQFT, Full Depth Reclamation (5.0”) – 15250 SQ YD, Mill Bituminous Surface (5.5”) – 15250 SQ YD, Mill Bituminous Surface (3.0”) – 1467 SQYD, Bituminous Mixture – 5897 TON, 12” RC Pipe Sewer – 78 LIN FT, Concrete Curb and Gutter – 144 LIN FT, Concrete Walk – 172 SQFT, Silt Fence Type MS – 636 LIN FT, Boulevard Topsoil Borrow – 273 CU YD, Hydraulic Matrix Type Bonded Fiber Matrix – 1500 LB, Permanent and Temporary Erosion Control Items, and other miscellaneous road construction items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents