Similar Projects
Marymoor Stormwater Facility
New Construction
Conception
$900,000 est. value
WA

Lake Hills Interceptor Corrosion Rehabilitation
Renovation
Design
$19,000,000 est. value
WA

South Plant Dewatering and Truck Loading Bay Ventilation Improvements
Renovation
Design
$1,300,000 est. value
WA

Wastewater Eductor Decant Facility Pipeline Project
Renovation, Infrastructure
Bidding
$783,450 CJ est. value
Tacoma, WA 98405

Water Reclamation Facility Phase 2 Upgrades Project
Renovation
Bidding
$400,000 CJ est. value
Yelm, WA 98597

2022 Lakota Digester Building Roof Replacement - Rebid
Renovation - 10,199 SF
Sub-Bidding
$400,000 CJ est. value
Federal Way, WA 98023

Centrifuge and Gravity Belt Polymer
Term Contract
Sub-Bidding
Bellingham, WA 98225

Civil Structural Construction Work Order 2021-2022
New Construction
Post-Bid
$3,000,000 est. value
Seattle, WA

West Point Treatment Plant Capital Program Construction Work Order
New Construction
Post-Bid
$15,000,000 est. value
Seattle, WA

Interbay Forcemain and Odor Control Project
Renovation
Results
$1,100,000 est. value
WA

WWTP Digester 4
New Construction
Results
$13,244,000 est. value
Wenatchee, WA

Cedar Hills Leachate Lagoon- Lagoon Upgrade
Renovation
Design
$3,500,000 est. value
WA

RFP - Project Control Consulting Services
Term Contract
Bidding
Seattle, WA 98164

Water Scada Project - 2022
Renovation
Sub-Bidding
$300,000 CJ est. value
Othello, WA 99344

CM Services for the WPTP Raw Sewage Pump Replacement Project
New Construction
Post-Bid
$300,000 est. value
WA

Last Updated 08/13/2022 11:45 AM
Project Title

Filter Media Replacement - Maplewood Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Renton, WA 98057   (King County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work involved with this project shall not be allowed to occur between June 1 and September 30. The Contractor shall not commence the work to be performed until on or after October 1, 2022. The contractor must provide documents to demonstrate three (3) similar projects within the past ten (10) years to be considered. The work to be performed within 30 working days from the date of commencement under this contract shall include, but not be limited to: o Removal and replacement of greensand filter media (anthracite, greensand, and support gravel) in three existing greensand filter tanks oRemoval and replacement of granular activated carbon (GAC) media in three existing GAC confactors o Disposal ofspent media Should you require further assistance, contact Builder Exchange ofWashington at (425) 258-1303. Bidders are not to contact the City of Renton or the Engineer to obtain bidding documents The City of Renton in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 1J.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office ofthe Secretary, Part 21, Nondiscrimination in Federally-Assisted programs of the Department ofTransportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Women and Minority Business Enterprises (WMBE) are encouraged to bid. Questions about the project shall be addressed to: Katie Nolan, Public Works Department, at 425-430-7335 or knolan@rentonwa. gov A certified check or bid bond in the amount of five percent (5%) of the total of each bid must accompuny each bid The City's Fair Practices, Non Discrimination, and Americans with Disability ActPolicies shall apply. The estimated project cost is $250,000 to $300,000. The City reserves the right to reject any and/or all bids and to waive any and/or all informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents