Similar Projects
11Th Street Apartments
New Construction
Design
Mebane, NC

Seventh Avenue Streetscape
Infrastructure
Bidding
$2,000,000 est. value
Mountain Home, NC 28791

Turner Terrace Concrete Walk Installation/Repair
Infrastructure
Bidding
Lumberton, NC

Chapel Hill Transit-Parking Lot Expansion
Post-Bid
$200,000 to $350,000 est. value
Chapel Hill, NC 7516

Group 2 Sidewalk Improvement Project (Formal)
Post-Bid
Raleigh, NC

Wilson Street Sidewalk
Results
Wingate, NC

Riverwalk - NCDOT STBG-DA Project EB-5939
Results
Hickory, NC

Entrance and Surface Parking Improvements
Construction
Hendersonville, NC 28791

Construction of the Town Center Parking Lot Improvements
Infrastructure
Bidding
Cornelius, NC

Trivium Court and Trivium Parkway
Post-Bid
Hickory, NC 28601

Walnut Street Depot Parking Lot Contact No. 1 - Parking Lot Addition
Results
Less than $215,706 est. value
Farmville, NC

North Front Street Streetscape and Utilities Improvements
Infrastructure
Bidding
Wilmington, NC 28401

Lanvale Forest Subdivision Infrastructure Project
Post-Bid
Leland, NC 28451

New Walking Trail at Briar Chapel Park
Results
Pittsboro, NC 27312

South Ellerbe Restoration Phase 2 - Site Demolition and Mass Grading
Demolition, Infrastructure, Alteration
Bidding
Durham, NC 27701

Last Updated 11/02/2021 09:08 AM
Project Title

College/New Garden Road Sidewalk

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $620,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract includes approximately 2,660 square yards (SY) of sidewalk installation. Sidewalks shall be installed along the west side of New Garden Road starting at Ballinger Road going towards West Friendly Avenue. Additionally, sidewalks shall be installed along the east side of College Road starting approximately 530 feet south of West Friendly Avenue going towards Guida Drive. Sections will not be awarded separately. All replaced curb ramps shall be ADA compliant.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents