Similar Projects
Northeast Elementary Magnet School Expansion
Addition
Conception
Danville, IL 61832

D5 and/or D6 Secondary Vendor for Electrical Maintenance and Repair Services
Alteration
Bidding

CDBG Mechanical/Electrical Improvements
Alteration
Bidding
Danville, IL 61832

Tower Window Replacement for Security Guard Towers
Post-Bid
Danville, IL 61834

Boiler Procurement
Post-Bid
Danville, IL

Rehabilitate Hot Water Distribution System -General
Results
Less than $1,500,000 est. value
Danville, IL 61834

Corridor Renovation
Renovation
Results
Hoopeston, IL 60942

J059--SOURCES SOUGHT: SDVOSBs, VOSBs, or Small Businesses for Automatic Transfer Switch (ATS) Maintenance and Testing at the VA Illiana Health Care System Danville, Illinois
Post-Bid
Danville, IL - Danville, IN 61832

2021 HVAC & Electrical Upgrades
Renovation
Results
Hoopeston, IL

District Window Replacement
Post-Bid
Bismarck, IL 61814

Corridor Renovation
Renovation
Results
Danville, IL 61832

Temporary Boiler Installation
Alteration
Post-Bid
Danville, IL

Danville High School Boiler Replacement
Results
Danville, IL 61832

Danville High School Auditorium AV-Lighting-Rigging Improvements
Alteration
Results
Danville, IL 61832

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

Last Updated 02/28/2022 05:58 PM
Project Title

Salt Fork North Elementary School & South Grade School / Jr. High School Mechanical and Window Replacements

Physical Address View project details and contacts
City, State (County) Catlin, Sidell, IL 61876   (Vermilion County)
Category(s) Education, Single Trades
Sub-Category(s) Electric, Elementary School, Mechanical, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Cost Estimates: Salt Fork - North Elementary - $2,600,000.00 Salt Fork - South GS / Jr High - $5,100,000.00 The project consists of: Mechanical replacements and window replacements at both the North Elementary School and the South Grade School / Jr. High. Electrical upgrades also will need to occur at both schools. PROJECT DESCRIPTION: The project includes: 1. North Elementary School a. Replacement of the existing heating systems with 4-pipe Vertical Unit Ventilators and fan coil units throughout the building. RTU’s will be installed at the gym area. New piping and conduits will be ran to each of the units per the plans. b. New boilers / pumps and chillers will be installed, and the building requires an electrical upgrade per the plans. c. The original windows at the NE wing and gym will be replaced with aluminum storefront systems. These windows do contain asbestos in the glazing compounds / sealants, so they will be removed by others. There are also windows on the south elevation that get replaced with aluminum storefront systems and these windows do NOT contain any asbestos. d. Louvers will be installed within the existing masonry walls and storefront systems as shown on the plans. e. General patching and painting as needed where demolition has occurred. 2. South Grade School / Junior High School a. Replacement of the existing heating systems with 4-pipe Vertical Unit Ventilators and fan coil units throughout the building. AHU’s will be installed at the gym areas and other areas as shown on the plans. New piping and conduits will be ran to each of the units per the plans. b. New boilers / pumps and chillers will be installed, and the building requires an electrical upgrade per the plans. c. The windows will be replaced with aluminum storefront systems as shown on the plans. d. Louvers will be installed within the existing metal panel infill walls and masonry walls as shown on the plans. e. General patching and painting as needed where demolition has occurred.

Details

Elementary School, New Construction.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents