Similar Projects
Corrections to Sprinkler System
Renovation, Infrastructure
Design
$500,000 to $1,000,000 est. value
Chicago, IL 60612

Purchase And Installation of Fire Station Alerting System
Renovation, Infrastructure
Bidding
Quincy, IL

EAHS Fire Protection Sprinkler Phase 3
Infrastructure
Bidding
Aurora, IL 60505

Fire Hydrants and Accessories
Post-Bid
Mount Prospect, IL

Fire Alarm Systems Preventative Maintenance and Repair Services
Post-Bid
Chicago, IL

Replace Wander Guard and Fire Alarm Systems
Results
Less than $500,000 est. value
La Salle, IL 61301

Fire Protection Alarm & Lighting Upgrades
Renovation
Results
Chicago, IL 60601

Fire Alarm Replacement
Alteration
Bidding
Edwardsville, IL 62025

Fire Suppression Systems Maintenance And Repair Services
Term Contract
Post-Bid
Less than $75,000 est. value
Chicago, IL 60602

Replace Fire Alarm System - Physical Education Building
Results
Chicago, IL 60612

Emergency Fire Alarm System Replacement
Alteration
Bidding
Less than $800,000 est. value
IL

Elevator Upgrade and Fire Alarm Replacement
Renovation
Post-Bid
Chicago, IL 60612

DHS/Elgin MHC Fire Alarm Repair and Maintenance
Results
Elgin, IL

110,000 Gallon Standpipe Rehabilitation
Infrastructure
Bidding
Arrowsmith, IL

2021 Sprinkler Head Replacement at Oak Prairie JHS
Post-Bid
Homer Glen, IL 60491

Reported 03/21/2022 11:03 AM
Project Title

183 CES Base Fire Suppression Repair

Physical Address View project details and contacts
City, State (County) Springfield, IL 62707   (Sangamon County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The current fire suppression system is in a state of disrepair and has not had any upgrades since its original construction. The tank itself has deteriorated from the inside and the antiquated diesel pump has reliability issues. The removal and replacement of this system is critical to the life/safety of the employees of the 183d Wing. Objectives. To complete the work as shown in the attached drawings and specifications. Scope. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services necessary to: Complete demolition and construction as shown in the project documents. The contractor shall perform to the standards in this contract. The Project Work Site, Springfield Illinois Air National Guard Base (Springfield IL ANG), is a U.S. military installation and as such, all aspects of the work on the site shall be subject to the requirements herein. The Contractor shall coordinate all activities for compliance with these requirements through the Contracting Officer’s Representative (COR). Contractor shall notify COR at least 48 hours before authorization, coordination, or notification is required from the appropriate organization at Springfield IL ANG, unless otherwise noted.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents