Similar Projects
Water Treatment Plant
New Construction
Bidding
Dawson, IL

Chemical Addition Backup System at Stickney Water Reclamation Plant
New Construction
Bidding
$8,105,172 to $9,811,524 est. value
Stickney, IL

Water Treatment Plant
Renovation
Post-Bid
Effingham, IL 62401

WPCF Digester Rehabilitation
Post-Bid
Glendale Heights, IL 60139

Water Reclamation Center Dewatering System Improvements
Results
$2,000,000 est. value
Carol Stream, IL 60188

Water Treatment Plant Improvements Pre-Design Study
Renovation
Results
Bloomington, IL

Core & Main building
New Construction - 12,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Washington, IL

Wastewater Plant
New Construction
Pending Verification
$49,200 est. value
Sterling, IL

Upgrade Sewer Treatment Facility
Renovation
Bidding
$1,200,000 est. value
IL

Design-Build Services for South Slope WWTP Controls Improvements
Renovation
Post-Bid
Moline, IL 61265

Southern Illinois University - Edwardsville, Madison County Improve Water Treatment Plant Sand Filter
Results
Less than $600,000 est. value
Edwardsville, IL 62026

Argonne Utilities Upgrades (Au2) Phase 1 Design
New Construction - 50,000 SF
Post-Bid
$95,000,000 to $105,000,000 est. value
IL

Water Treatment Plant Filter Rehabilitation
Results
Quincy, IL 62301

Clark Street Water Treatment Plant Pressure Filter Media Replacement
Post-Bid
Sandwich, IL 60548

GAC Filter Media Replacement
Renovation
Results
Elgin, IL 60120

Last Updated 09/24/2021 07:57 AM
Project Title

GAC Filter Media Replacement

Physical Address View project details and contacts
City, State (County) Elgin, IL 60123   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and disposal of approximately 1,090 cu. ft. of spent GAC from each of two filters [Filters #2 and #4] at Riverside; rebuilding of Leopold model S surface agitator wash arms, installation of fine filter sand (if necessary) and virgin GAC into the same two filters as described in the Detailed Specifications below. The spent granular activated carbon media will be landfilled.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents