Similar Projects
Regionwide Replacement of Pavement Markings
Infrastructure
Bidding
$5,000,000 to $20,000,000 est. value
Edwards, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Palisade Asphalt Repair Projects June 2021
Infrastructure
Post-Bid
Palisade, CO

Road Overlays Program
Results
$150,000 to $200,000 est. value
Fruita, CO 81521

2020 Fruita Roundabouts Project
Results
Fruita, CO

PMAA, RMCR, Asphalt Maintenance
Infrastructure
Post-Bid
Palisade, CO 81526

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Z--Blm-Co - Rabbit Valley Roads and Parking
Term Contract
Post-Bid
$25,000 to $100,000 est. value
CO

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Road Overlay Project
Infrastructure
Post-Bid
Fruita, CO

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Mesa County Overlay 2022
Infrastructure
Post-Bid
Whitewater, CO

Lorey Drive Improvements Project
Results
Less than $200,000 est. value
Grand Junction, CO 81505

2022 Contract Street Maintenance - Asphalt Overlays
Term Contract, Infrastructure
Post-Bid
Grand Junction, CO

SH 141 North of Naturita Surface Treatment
Results
$5,000,000 to $20,000,000 est. value

Last Updated 05/25/2022 06:55 PM
Project Title

Partial Reconstruction of South Rim Drive and Kansas Avenue

Physical Address View project details and contacts
City, State (County) Grand Junction, CO 81504   (Mesa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified and Interested companies for all labor, equipment, and materials required to complete the project, which includes approximately 14,398.65 SY of asphalt mat removal, 14,348.60 SY of existing base course reconditioning, 40.83 SY of concrete gutter, 2,802.06 Tons of asphalt pavement, utility adjustments, and reset of landscaping. All dimensions and scope of work should be verified by Contractors prior to submission of bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents