Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Ebenezer Rd / Swatara Creek
Demolition, New Construction, Infrastructure
Design
$4,157,918 CJ est. value
Jonestown, PA 17038

PA 756 - Lamberd Ave to Alvin St
Infrastructure
Design
$4,702,363 CJ est. value
Richland, PA 15904

Camera Inspecting, High-Pressure Jetting and Descaling Building Drain Lines
Term Contract
Bidding
Lebanon, PA 17042

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construction of Water Main Project
Infrastructure
Post-Bid
Lebanon, PA 17042

Area 10 Tank Wash Repair
Infrastructure
Results
$500,000 CJ est. value
Annville, PA 17003

Area 10 Tank Wash Repair
Infrastructure
Results
$500,000 CJ est. value
Annville, PA 17003

Ebenezer Rd / US 22
Infrastructure
Construction
$1,098,438 CJ est. value
Jonestown, PA 17038

2023 Road Work
Infrastructure
Construction
$443,501 CJ est. value
Cleona, PA 17042

Fort Indiantown Gap - Construct New Auditorium
New Construction, Infrastructure
Pending Verification
$8,500,000 CJ est. value
Annville, PA 17003

Mt Gretna Road Resurface 2
Infrastructure
Conception
$2,200,000 CJ est. value
Lebanon, PA 17042

Lingle Road Reconstruct
Infrastructure
Design
$10,021,151 CJ est. value
Palmyra, PA 17078

Annville Free Library Expansion and Renovation Project
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$200,000 CJ est. value
Annville, PA 17003

Last Updated 05/12/2023 09:31 AM
Project Title

Area 11 Sewer Lift Installation

Physical Address View project details and contacts
City, State (County) Annville, PA 17003   (Lebanon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of providing new sewer service to approximately 22 buildings along Utility Road between Clement Ave. and Service Road. A new pump station will be installed across from Warehouse Road and the discharge pipe will run under Vessle Run up to Area 9 manhole. A new simplex grinder pump will be installed for building 11-17, Fort Indiantown Gap, Annville, PA All potential bidders are invited and urged to attend this Pre-Bid Conference. There is no Bid Guaranty required for this Project. There are no Small Business goals attached to this bid. ESTIMATED RANGE: .1 General - $600,000 - $800,000; .4 Electrical - $20,001 - $50,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents