Similar Projects
Aqua Viva Water Treatment Facility Urban Lake Park
New Construction
Conception
Yuma, AZ

Figueroa Ave WPCF Facility Improvements
Renovation
Conception
$61,500,000 est. value
Yuma, AZ 85364

WTP #5
New Construction
Design
$12,228,914 est. value
Buckeye, AZ

WTF #9
New Construction
Design
$6,190,000 est. value
Buckeye, AZ

Sun Leisure Estates Water Treatment System Operation and Maintenance Services
Term Contract
Post-Bid
Yuma, AZ 85364

Construction Manager at Risk Project at NWTP South Reservoir Water Quality Improvements
Post-Bid
Gilbert, AZ 85234

Waste Water Treatment
Results
Luke Air Force Base, AZ 85309

Neely WRP Facility Rehabilitation
Results
Gilbert, AZ 85233

Water Treatment Plant Improvements
Renovation
Conception
$1,782,500 est. value
Lake Havasu City, AZ

NWTP Alternatives Evaluation and Construction
New Construction
Post-Bid
Gilbert, AZ

Citywide Water Resources Water Treatment
Term Contract
Results
Less than $15,000,000 est. value
Scottsdale, AZ 85258

Arsenic Filter Media Replacement for Luke AFB
Post-Bid
Luke Air Force Base, AZ

Union Hills Water Treatment Plant Rehabilitation 2020 CMAR
Results
Phoenix, AZ 85024

Big Park Wastewater Treatment Plant - UV Disinfection System
Renovation, Infrastructure
Post-Bid
$650,000 est. value
Prescott, AZ

Northwest Water Reclamation Plant (NWWRP) Process Improvements
Results
$28,600,000 est. value
Mesa, AZ 85201

Last Updated 10/06/2021 01:31 PM
Project Title

Y--GRCA 229035 - Phantom Ranch WWTP - St Improvements

Physical Address View project details and contacts
City, State (County) State-Wide: AZ
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of providing corrections to the existing Phantom Ranch Wastewater Treatment Plant (WWTP). The WWTP is located at the base of the Grand Canyon in the Phantom Ranch developed area adjacent to the Colorado River. The plant has a maximum design flow capacity of 12,000 gallons per day. Improvements being provided include a new headworks structure with comminutor, demolition of existing headworks structure, integrated, fixed-film, activated sludge (IFAS) system, replacement of aeration system in aerobic digester, repairs to clarifier, replacement of existing tertiary treatment unit with cloth filter press system, installation of variable frequency drives on existing blowers, and providing controls and supervisory control and data acquisition (SCADA) hardware. Demolition and removal of equipment being replaced is also included. The plant must be kept in service during construction. Time for construction on site is limited to 6-months with the remainder of contract time allotted to approval, fabrication, and delivery of equipment and materials, some of which are expected to have long lead times. Access to the site will be provided by helicopter using helicopters provided under separate contract to the Government. The contractor will be responsible for working with the Government to minimize the required flights to construct the project and will be responsible for all rigging, slings, and related material required to carry equipment and materials to and from the project site. No existing housing is available at the project location. The selected contractor will be required to provide a construction camp for workers adjacent to the project site. Previous contractor experience in construction at extremely remote sites in desert environments is desireable.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents