Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Design - EHRM Infrastructure Upgrades Design Manchester
Renovation, Infrastructure
Design
$20,000,000 to $50,000,000 est. value
Manchester, NH 03104

Engineering, Planning and Development
Post-Bid

C1DA--Sub Basement Utilities Design
Post-Bid
$6,500,000 est. value
Manchester, NH 03104

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Multiple Award Contract (MAC), Indefinite Delivery /Indefinite Quantity (IDIQ), Architect-Engineer (A-E) Traffic Engineering and Transportation Planning Services in Support of Projects Primarily in the Mid-Atlantic (NAVFAC MIDLANT) Area of Responsibility
Term Contract
Post-Bid
$40,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Engineering Services for Baboosic Lake (Pine Knoll Shores) Drainage Study
Infrastructure
Post-Bid
Merrimack, NH

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Engineering Study and Cost Analysis
Alteration
Post-Bid
Hollis, NH

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

C--Multiple Award Task Order Contract (MATOC)
New Construction, Term Contract
Post-Bid

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Microgrid Architectural And General Engineering Services
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Last Updated 10/08/2022 06:03 AM
Project Title

RFP - Hazmat Abatement Consulting Services for Elementary School Renovation Projects

Physical Address View project details and contacts
City, State (County) Nashua, NH 03064   (Hillsborough County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Nashua School District (NSD) invites proposals from qualified consulting firms to provide surveys, testing, work plans and monitoring for the handling of all hazardous waste materials that may be encountered during the renovations of Birch Hill and Main Dunstable Elementary Schools. It is anticipated that the school's renovations, will be conducted in multiple phases, commencing in late Spring 2023 and running through the Fall of 2024. Specific scheduling of the abatement contractors and monitoring consultants must be coordinated with the Nashua School District and the project's construction manager, Harvey Construction. Both elementary schools were constructed in 1972 and last renovated in 1993. They are approximately 65,000 square feet each and house grades K-5. These renovations will be conducted concurrently (both schools at the same time) and in occupied mode (e.g., work being done during the school year), in addition to work during school vacation periods. The qualified firm will use inspectors and project designers licensed to practice in New Hampshire. In addition, prospective firms must meet the following standards as they relate to this request: 1. Have the adequate financial resources or have the ability to obtain such resources as required for the performance of all services. 2. Have the necessary experience, organization, technical and professional qualifications, skills and facilities. 3. Be able to comply with the proposed or required time of completion or performance schedule. 4. Have a demonstrated satisfactory record of performance. 5. Provide documentation of adequate insurance coverage. Proposals for this work will briefly address each of the above standards. The method of Contractor Selection has not been Determined at this time.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents