Similar Projects
Edgewood Road Trail Phase 2B - Bridge Modifications and Trail
Conception
$4,060,000 est. value
Cedar Rapids, IA 52407

Shaver Road Bridge and Floodwall, Phase 4
Conception
$1,500,000 est. value
Cedar Rapids, IA 52402

Cedar Rapids Flood Risk Management, Reach 3, 12th Avenue SE Road Closure & CRANDIC Railroad Closure
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Cedar Rapids, IA

Cedar Rapids Flood Risk Management Project
Term Contract
Design
$10,000,000 est. value
Cedar Rapids, IA

Bioretention Cells at DCSD and Davis Street Properties
Infrastructure
Bidding
$300,000 est. value
Bloomfield, IA

Pioneer Avenue SouthEast at Oakridge Drive Drainage Improvements
Infrastructure
Bidding
$110,000 est. value
Cedar Rapids, IA 52403

Wanatee Tributary Restoration
Infrastructure
Post-Bid
$147,000 est. value
Marion, IA

Drainage District No 82 Open Ditch and Lateral B Cleanout
Infrastructure
Post-Bid
Algona, IA

Purina Drive Flood Wall Replacement
Results
$120,300 est. value
Dubuque, IA

8th Street Southwest Between 21st Avenue and 22nd Avenue Drainage Improvements
Infrastructure
Results
$20,000 est. value
Cedar Rapids, IA

USACE South Railyard Floodwall CC
Conception
Cedar Rapids, IA

Visitor Center Breezeway and Bridge Restoration 36698
Renovation, Infrastructure
Design
$250,000 to $500,000 est. value
Harpers Ferry, IA 52146

Bridge Replacement on Conrad Lane
New Construction, Infrastructure
Bidding
$200,000 est. value
Bankston, IA 52045

Wagaman Mill Retaining Wall Repairs
Infrastructure
Post-Bid
$250,000 to $350,000 est. value
Lynnville, IA 50153

South 35th and Grand Valley Culverts
Infrastructure
Results
IA 50265

Reported 04/27/2022 12:00 AM
Project Title

East Street Stabilization Project

Physical Address View project details and contacts
City, State (County) Van Meter, IA 50261   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $120,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a civil project in Van Meter, Iowa. Completed plans call civil work for a bridge / tunnel and road / highway. The extent of the work involved is the furnishing of labor and new materials for reconstruction of backfill along an existing single-barrel reinforced concrete box culvert conveying a trail beneath East Street including pavement removal and reconstruction, removal and reinstallation of guardrail, excavation, grading, restoration, and traffic control in accordance with the contract documents.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents