Similar Projects
Pearl Street Apartments
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Denver, CO 80203

Towneplace Suites and Fairfield Inn by Marriott / Denver
New Construction, Infrastructure
Design
$25,100,000 CJ est. value
Denver, CO 80204

Our Lady of the Lourdes School - Phase II
New Construction, Infrastructure - 21,000 SF
Design
$1,000,000 CJ est. value
Denver, CO 80210

Level 5A Roadway Rehabilitation
Infrastructure
Bidding
$900,000 CJ est. value
Denver, CO 80202

20th Street and Chestnut Place Intersection Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Denver, CO 80202

High Point North Early Grading Project
Infrastructure
Post-Bid
Denver, CO 80249

North East Regional Office Addition
Addition, Demolition, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Denver, CO 80216

PKAA, Alpine Gulch Project
Results
$109,000 est. value
Denver, CO

PKAA, RAD Project
Results
$100,000 to $150,000 est. value
Denver, CO

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

Block 176
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

Kabin 2.0 North and South Buildings
New Construction, Infrastructure - 119,123 SF
Pending Verification
$38,400,000 CJ est. value
Denver, CO 80216

The River Mile
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Denver, CO 80204

York Street Apartments
Demolition, New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Denver, CO 80210

Sherman Channel Project
Infrastructure
Bidding
$500,000 CJ est. value
Denver, CO 80202

Last Updated 10/03/2022 09:38 AM
Project Title

Carbon Health / Denver

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Medical Office/Outpatient, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the construction of a new medical clinic. The project is in the planning stage. As of August 4, 2021, no building permits have been issued or applied for with the city. Information regarding the architect and general contractor has not been determined. Although a firm timeline for construction has not been determined, construction is not expected to begin before spring 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents